QM2 to Have Pod Repaired After Cruise

Friday, January 20, 2006
While investigators continue to investigate how the Queen Mary 2 sideswiped a channel wall on its way out of Port Everglades, attention now turns to the extent of damage to one of its four pods, and who will be tapped to fix it.

After returning to port when the captain noticed trouble with one of the four engine pods, the cruise ship returned to its voyage carrying 2,543 passengers on a 38-night South American cruise.

Repairs to the pod reportedly will be made after the current cruise, which started Sunday in New York and is scheduled to end in Los Angeles. There’s no word on where the repairs will be completed.

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

MHI to Change Name of Group Company

Effective November 1 Mitsubishi Heavy Industries, Ltd. (MHI) will change the name of its group company in Singapore from Mitsubishi Heavy Industries Engineering & Services Private Ltd.

Petrobras P-66 Platform Module to Boost Production

The P-66 platform’s first modules, built at the Tomé Ferrostaal Consortium’s Module Plant located at the Port of Maceió, Alagoas, are now ready and loaded on the São Tomé barge.

Exmar Optimistic About Gas Carrier Market into 2015

Belgian gas shipping group Exmar said on Thursday that the market for its very large and midsize gas carriers was at historically high levels in the third quarter

Ship Repair & Conversion

Braemar Hosts Insurance Experts

Braemar (incorporating The Salvage Association) welcomed an invited group of marine insurance professionals onto its specialist port and shipyard familiarization

Minimize the Risks, Think Cold Bonding

Cold bonding: a safer alternative to hot work Hot work required for welding, grinding and cutting operations presents certain potential hazards when conducted

Goltens Opens Houston Service Facility

Goltens Worldwide today announced the opening of its new full service facility located within two miles from the Port of Houston. Following months of planning and machinery and equipment installation,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2721 sec (4 req/sec)