Costa Serena Cross Section Arrives

Tuesday, February 07, 2006
The fore end section of the Costa Serena arrived in Fincantieri’s Sestri Ponente shipyards in Genoa recently. The Costa Serena is the second of Costa Crociere’s three new sister ships due to enter service over the next four years.

The fore end section of the new building is about 91 m in length and 3,200 gt. It left the Palermo yard, where it was assembled, on February 1, and will now be placed in the building graving-dock at the Sestri Ponente yard; there, it will be fitted to the aft end section of the ship, which is currently under construction. The cut of the first plates of Costa Serena started in April 2005.

The Costa Serena is the second of three 112,000 gt sister ships with guest capacity of 3,780 ordered by Costa Crociere from Fincantieri and entailing a total investment of almost 1.5 billion euros. The first of the three, the Costa Concordia, will enter into service in July 2006; the Costa Serena in May 2007; the third vessel, whose name is yet to be announced, will be completed in summer 2009.

Thanks to the arrival of these three new ships, the fleet bearing the Costa Crociere brand, currently Europe’s largest and most advanced, will be 13 strong by 2009, with an increase in capacity of over 50%.

Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Cruise Ship Trends

Silversea Cruises Plans New Flagship

Cruise operator Silversea Cruises has unveiled its new flagship, the Silver Muse, which will begin sailing the seas in April 2017.    Built by Italian shipbuilding company Fincantieri,

Silversea Cruises Orders Luxury Ship from Fincantieri

Shipbuilder Fincantieri has received an order to build a new luxury cruise ship for client Silversea Cruises due for delivery in April 2017.    At 40,700 grt and accommodating 596 guests,

Confidence Low in Shipping Idustry

Confidence levels in the global shipping market have fallen to a seven-year low as a glut of cargo ships, weak freight rates and excess liquidity continue to batter the industry,

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Ship Electronics Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2145 sec (5 req/sec)