Darwin LNG Shipment Delayed

Wednesday, February 08, 2006
The first shipment of liquefied natural gas from Darwin has hit a snag, with the tanker delayed in port for several days. The Kotowaka Maru arrived at ConocoPhillip's Wickham Point plant in Darwin early last Wednesday to load the first cargo from Australia's second LNG export project. The shipment was due to leave Darwin within two days, but the 125,000 cubic meter carrier still remained in the port last night. About 3 million tons of LNG, drawn from the Bayu Undan gas fields in the Timor Sea, have been contracted each year to Tokyo Electric and Tokyo Gas for 17 years. LNG gas carriers are due to arrive in Darwin every seven to 10 days, with each load initially expected to take 10-12 hours.

(Source: The Australian)

Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

WWII Wrecks Found off North Carolina

German U-boat 576 and freighter Bluefields found within 240 yards A team of researchers led by NOAA’s Office of National Marine Sanctuaries have discovered two

US & ROK Navies to Participate in Exercise Clear Horizon

The U.S. and Republic of Korea (ROK) navies will participate in Exercise Clear Horizon, October 20-24, in waters south of the Korean peninsula. Clear Horizon

Mount Whitney Departs Batumi, Georgia

The U.S. 6th Fleet command and control ship USS Mount Whitney (LCC 20) departed Batumi, Georgia, Oct. 18 after completing a successful port visit. While in Batumi,

LNG

Weak Oil Threatens US Export of LNG

Plunging global oil prices may turn hopes for cheap liquefied natural gas supplies from the United States into a costly disappointment for Asian buyers who have

Singapore’s MPA Discuss LNG Bunkering

The Maritime and Port Authority of Singapore (MPA), Antwerp Port Authority, Port of Rotterdam and Port of Zeebrugge participated in a Liquefied Natural Gas (LNG)

New Standard for LNG Cargo Containment Systems

Wilhelmsen Technical Solutions (WTS) said it has successfully completing the gas trial for the first LNG carrier built to a Boil Off Rate (BOR) of 0.08% per day.

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Pipelines Port Authority Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1153 sec (9 req/sec)