Gladding-Hearn Builds New Pilot Boat for Delaware Pilots

Friday, February 24, 2006
Gladding-Hearn Shipbuilding, Duclos Corporation, is nearing completion of a second Chesapeake class pilot boat for the Delaware pilots. Delivery of the new 53-footer, Lewes, in March will mark the ninth pilot boat of this new class since 2002. Designed by C. Raymond Hunt & Associates, the new all-aluminum pilot boat measures 52.5 feet overall, with a 17-foot beam and 4.8-foot draft, and will have a top speed of 26 knots. The launch will be powered by twin Daewoo V180TIM, 10-cylinder, diesel engines, each delivering 640 bhp at 2100 rpm, with ZF 350A gears. The engines will turn 5-blade Hall & Stavert bronze propellers through three-inch shafts. The Delaware pilots chose an unpainted launch to reduce maintenance. A three-zone diesel-fired Espar Hydronic cabin, deck, and handrail heating system, which circulates heated water through tubes below the wheelhouse, the main deck and handrails, and three 24,000 btu fan coil units will heat the vessel’s interior as well as prevent ice build-up on the decks in the winter. The forward wheelhouse windows feature ¾-inch electrically heated laminated glass for de-icing. The wheelhouse will be outfitted with five Stidd reclining seats and a settee. Interior sound levels are projected to be 78 dba. At the transom are throttle and steering controls, and a winch-operated U-frame over a recessed platform for pilot rescue operations.
Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Energy

Oceans Can’t Take Any more: Researchers Fear Fundamental Change

Our oceans need an immediate and substantial reduction of anthropogenic greenhouse gas emissions. If that doesn’t happen, we could see far-reaching and largely

Teekay LNG Partners Declares Distribution

Teekay GP LLC, the general partner of Teekay LNG Partners L.P. has declared a cash distribution of $0.70 per unit for the quarter ended June 30, 2015. The cash distribution is payable on August 14,

Technip Samsung JV Wins 2 FLNG Project Contracts

The Browse project covers the realization and installation of three FLNG units to develop the Brecknock, Calliance and Torosa fields in the Browse Basin, 425 kilometers North of Broome,

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Port Authority Salvage Ship Electronics Ship Simulators
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1557 sec (6 req/sec)