Gladding-Hearn Builds New Pilot Boat for Delaware Pilots

Friday, February 24, 2006
Gladding-Hearn Shipbuilding, Duclos Corporation, is nearing completion of a second Chesapeake class pilot boat for the Delaware pilots. Delivery of the new 53-footer, Lewes, in March will mark the ninth pilot boat of this new class since 2002. Designed by C. Raymond Hunt & Associates, the new all-aluminum pilot boat measures 52.5 feet overall, with a 17-foot beam and 4.8-foot draft, and will have a top speed of 26 knots. The launch will be powered by twin Daewoo V180TIM, 10-cylinder, diesel engines, each delivering 640 bhp at 2100 rpm, with ZF 350A gears. The engines will turn 5-blade Hall & Stavert bronze propellers through three-inch shafts. The Delaware pilots chose an unpainted launch to reduce maintenance. A three-zone diesel-fired Espar Hydronic cabin, deck, and handrail heating system, which circulates heated water through tubes below the wheelhouse, the main deck and handrails, and three 24,000 btu fan coil units will heat the vessel’s interior as well as prevent ice build-up on the decks in the winter. The forward wheelhouse windows feature ¾-inch electrically heated laminated glass for de-icing. The wheelhouse will be outfitted with five Stidd reclining seats and a settee. Interior sound levels are projected to be 78 dba. At the transom are throttle and steering controls, and a winch-operated U-frame over a recessed platform for pilot rescue operations.
Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Energy

Goliat FPSO in Norway

The Goliat FPSO was successfully floated off the heavy-lift vessel, Dockwise Vanguard, in the fjord outside Hammerfest, says Eni Norge    The Goliat platform has arrived in Hammerfest,

Skangass Celebrates Topping Up

Nordic liquefied natural gas operator Skangass  has celebrated a topping out ceremony at its Pori LNG terminal. The company said it was making progress in the

Falklands' Oil Drilling at Isobel Deep Suspended

Oil explorers drilling in the waters north of the Falkland Islands have suspended work on the second well of their 2015 current six-well drilling campaign after a technical problem.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Pipelines Pod Propulsion Port Authority Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2014 sec (5 req/sec)