Canadian Shipyard wins $45M Order

Friday, March 03, 2006
Canadian Shipbuilding and Engineering has won a $39.6 million order for three new ships that will keep the St. Catharines, Ont., shipyard running at full employment for the next two years, Buffalo News reported. The order, which resulted from an alliance with Dutch shipbuilder Peters Kampen Shipyards that was announced last September, is expected to keep Port Weller Dry Docks' employment at 250 through the end of next year. The ships were ordered by a British firm, Carisbrooke Shipping. (Source: Buffalo News)

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter January 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Meyer Turku Lays Keel of Tallink’s LNG Ferry

The keel of the Tallink’s new LNG-powered fast ferry Megastar was laid at the Meyer Turku shipyard   The hull assembly of Tallink’s new fast ferry Megastar started

Pentagon: Cut in LCS Ship Program 'Not an Indictment'

U.S. Deputy Defense Secretary Robert Work said the Pentagon's plan to truncate the Littoral Combat Ship program at 40 ships instead of 52 reflected budget pressures

New Multipurpose Tractor Tugs from OSD

Netherlands-based OSD (Offshore Ship Designers) has designed a new series of tractor tugs which can be used for a range of functions, including escort operations,

 
 
Maritime Contracts Maritime Standards Navigation Pipelines Pod Propulsion Port Authority Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0713 sec (14 req/sec)