Canadian Shipyard wins $45M Order

Friday, March 03, 2006
Canadian Shipbuilding and Engineering has won a $39.6 million order for three new ships that will keep the St. Catharines, Ont., shipyard running at full employment for the next two years, Buffalo News reported. The order, which resulted from an alliance with Dutch shipbuilder Peters Kampen Shipyards that was announced last September, is expected to keep Port Weller Dry Docks' employment at 250 through the end of next year. The ships were ordered by a British firm, Carisbrooke Shipping. (Source: Buffalo News)
Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Ingalls-built National Security Cutter Completes Acceptance Trials

Huntington Ingalls Industries (HII) announced today that the company's fifth U.S. Coast Guard National Security Cutter (NSC), James (WMSL 754), has completed her acceptance trials.

Willard Adds Sales Manager for Gulf Coast, Florida

Willard Marine, Inc. has hired Jimmy Sorenson as regional sales manager for the Gulf Coast and Florida.   Sorenson served 11 years with the U.S. Coast Guard in

Thoma-Sea Launches US-flagged OSV

Technology Associates, Inc. (TAI) of New Orleans, La., announced that another derivative of a vessel built from TAI’s EnviroMax designs was launched.   Thoma-Sea Marine Constructors,

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Pipelines Pod Propulsion Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1461 sec (7 req/sec)