Red Dragon II Production Begins

Friday, March 10, 2006
The 52m (170ft) sloop Red Dragon II commenced construction at Alloy Yachts Auckland New Zealand in March 2006. Contracted by an International Yachtsman, Red Dragon II is the fifth yacht over 50m built by Alloy Yachts. She has a beam of 10.2m (33.5ft), draws 4.9m (16.1ft) and a displacement of 354 tonnes. She will be built to Lloyds Classification and will comply with the Large Commercial Yacht Code LY2. The design from Dubois Naval Architects is for a high performance aluminum sloop which represents a world luxury cruising yacht with the ability to stay operational for long periods at sea without outside assistance. Red Dragon II will be flagged in the Cayman Islands and is scheduled for delivery in May 2008.
Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Tanker Trends

Teekay LNG Partners Declares Distribution

Teekay GP LLC, the general partner of Teekay LNG Partners L.P. has declared a cash distribution of $0.70 per unit for the quarter ended June 30, 2015. The cash distribution is payable on August 14,

NITC Tankers Chart Western Course

Iran’s largest shipping company NITC, the privatized Iranian shipping company, is in talks for permission to sail in Western waters, says a report in WSJ.   NITC

Ardmore Shipping Takes Tanker Delivery

Ardmore Shipping Corporation took delivery of the newbuild product and chemical tanker vessel Ardmore Seafox on June 25, 2015, the company announced today. The 49,

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Port Authority Salvage Ship Electronics Ship Simulators
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1453 sec (7 req/sec)