Coast Guard, Dept. of Ecology to Conduct Investigation

Tuesday, March 21, 2006
The Coast Guard, the Washington State Department of Ecology and the City of Seattle Public Utilities continue to investigate the cause of the patches of light oil sheen that covered parts of of Elliott Bay in Seattle Friday. Federal, State and City of Seattle pollution investigators continued their search throughout the weekend and today for the cause of the oil spill. On Friday oil containment booms and sorbent materials were placed at storm drain outfalls at SW Lander St., and SW Florida St., on Harbor Island, along the West Waterway, as a precautionary measure to capture and collect any oil that may discharge from the drains. Both storm drains were monitored throughout the weekend and no oil was visible inside the booms. Additionally, the Coast Guard conducted helicopter flights during the weekend. The City of Seattle Public Utilities placed remotely operated cameras inside the Lander Street storm drain pipe today to determine if oil is present further up the drain. The Washington Department of Ecology is conducting a lab analysis of the samples taken of the spilled oil to assist in determining its origin. The Department of Ecology also is undertaking an assessment of state natural resources affected by the spill. The Coast Guard will work with the Department of Ecology, the City of Seattle and the Environmental Protection Agency to further investigate the source of the oil found in the storm water drain.
Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

CACI Named MSC Logistics Prime Contractor

CACI International Inc says it has been selected as a prime contractor to provide logistics support to the U.S. Navy’s Military Sealift Command (MSC) on the Worldwide

LCS MCM MP Puts Navy Closer to Fleet Implementation

NSWC Panama City hosted a two-week demonstration in July that verified Sailors' ability to conduct maintenance on the Littoral Combat Ship's Mine Countermeasure

USS Independence Successfully Completes Special Trials

USS Independence (LCS 2) successfully completed Special Trials (ST), a series of at-sea tests on Aug. 2, following the ship's participation in the multinational

Environmental

DoD Awards US$117-M New Orleans Dredge Contract

The US Department of Defense informs that it has awarded Boh Bros. Construction Co., LLC, New Orleans, Louisiana, a US$116,956,672 firm-fixed-price contract with

Chilean Court Rejects Appeal Against Crow River Project

Chile's Supreme Court on Thursday rejected an application for an environmental organization against Crow River hydroelectric project, which plans to build in the

Scotland Site for World's Biggest Tidal Array

The world’s biggest tidal array is to be built in North Scotland bringing jobs and energy security to the Pentland Firth region, informs a UK Government news release.

 
 
Maritime Contracts Maritime Security Naval Architecture Offshore Oil Pipelines Port Authority Ship Electronics Ship Repair Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1519 sec (7 req/sec)