B.C. to replace 3 Ferries

Friday, March 24, 2006
The B.C. Treasury Board on March 22 approved an agreement that will allow the long-awaited purchase of replacements for the vessels on northern routes. The Treasury Board meeting was previously scheduled, and it was a coincidence that it was on the day that the passenger ferry struck a rock and sank off the north coast of the province. The terms of the agreement, under which the province will pay increased service fees to B.C. Ferries, have not been made public. It is estimated that the total cost to replace the Queen of the North, Queen of Prince Rupert and Queen of Chilliwack will be about $300 million. The new ferries should be in operation between 2009 and 2011. The three northern ferries were scheduled to be retired by 2010. (Source: Globe and Mail)
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

LNG

Louisiana to Get Natural Gas Liquefaction and Fueling Facility

Tenaska Bayou LNG expected to meet growing marine, transportation and oil and gas exploration and production demand on the Gulf Coast Tenaska NG Fuels, LLC and Waller Marine, Inc.

GTT Earns Five AIPs for Multi-gas Membranes

Gaztransport & Technigaz (GTT), designer of membrane containment systems for the maritime transportation and storage of LNG (Liquefied Natural Gas) announced five

Steel Cut for Yamal LNG Project’s Lead Tanker

A steel-cutting ceremony was held on September 29 for the lead gas tanker ordered by SCF Group for transportation of liquefied natural gas (LNG) under the Yamal LNG project.

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Offshore Oil Pipelines Pod Propulsion Port Authority Salvage Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1091 sec (9 req/sec)