Weaver's Cove Offers Plan for LNG Shipments

Friday, April 07, 2006
Weaver's Cove Energy plans to use liquefied natural gas transports that are even smaller than the second set of vessels it specified in recent updates to its proposal to operate an LNG plant on the Taunton River and newer, stronger tug boats to guide them, the company said. According to South Coast Today, more LNG tankers, however, will sail to Fall River under the change because of the lower capacity of the vessels and because tankers once earmarked to go to a proposed Providence terminal denied by federal regulators will instead head to Weaver's Cove. The changes also require more openings of the new Brightman Street Bridge, the company said. The disclosures come in a March 27 letter from Weaver's Cove Chief Executive Officer Gordon Shearer to the Coast Guard, which is considering whether to issue a letter of recommendation for the project. The Coast Guard had questioned the safety of a navigational maneuver required by its second set of LNG tankers — small enough to fit through the opening of the old Brightman Street draw bridge — in the 1,100 foot separation between the current bridge and its replacement structure. Originally, Weaver's Cove proposed using a 950-foot-long, 145-foot-wide vessel with a draft of 371/2 feet that would arrive 60 times a year. The vessels in the first new proposal were 725 feet long, 82 feet wide and a draft of 36 feet that would arrive 120 times a year. The opening of the old Brightman Street Bridge is 98 feet. The opening of the new bridge under construction, north of the proposed Weaver's Cove terminal, is 200 feet. The openings are not navigationally aligned. (Source: SouthCoastToday.com)
Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

DNV-GL Approves Kongsberg Engine Room Simulators

Kongsberg Maritime has received DNV-GL certification for three of its latest engine room simulator models designed to provide in-depth training on the K-Sim Engine simulator platform.

Container Shipping Lucky to Break Even in 2015

A toxic mixture of overcapacity, weak demand and aggressive commercial pricing is threatening liner shipping industry profitability for the rest of 2015, according

CMA CGM's OPDR Acquisition Approved by EU

The CMA CGM Group announced that the European Commission has approved its acquisition of OPDR. In order to finalize the acquisition, which was announced on November 25, 2014 by Jacques R.

LNG

First Gas Turbine-powered LNG Carrier Granted AIP

Hyundai Heavy Industries (HHI) announced it has jointly developed world’s first gas turbine-powered 174,000 m3 LNG carrier with GE Aviation and Marine and has secured

Japan's MHI Bags Indian Oil's LNG Storage Tank Contract

Indian Oil Corp (IOC) has awarded a contract to build two football stadium-sized liquefied natural gas (LNG) storage tanks at its upcoming Ennore LNG import terminal

Gazprom, Gasunie Sign Framework Agreement - LNG

At a Meeting between Alexey Miller, Chairman of the Gazprom Management Committee and Han Fennema, CEO and Chairman of the Executive Board of Gasunie a Framework

 
 
Maritime Standards Navigation Pipelines Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1290 sec (8 req/sec)