Weaver's Cove Offers Plan for LNG Shipments

Friday, April 07, 2006
Weaver's Cove Energy plans to use liquefied natural gas transports that are even smaller than the second set of vessels it specified in recent updates to its proposal to operate an LNG plant on the Taunton River and newer, stronger tug boats to guide them, the company said. According to South Coast Today, more LNG tankers, however, will sail to Fall River under the change because of the lower capacity of the vessels and because tankers once earmarked to go to a proposed Providence terminal denied by federal regulators will instead head to Weaver's Cove. The changes also require more openings of the new Brightman Street Bridge, the company said. The disclosures come in a March 27 letter from Weaver's Cove Chief Executive Officer Gordon Shearer to the Coast Guard, which is considering whether to issue a letter of recommendation for the project. The Coast Guard had questioned the safety of a navigational maneuver required by its second set of LNG tankers — small enough to fit through the opening of the old Brightman Street draw bridge — in the 1,100 foot separation between the current bridge and its replacement structure. Originally, Weaver's Cove proposed using a 950-foot-long, 145-foot-wide vessel with a draft of 371/2 feet that would arrive 60 times a year. The vessels in the first new proposal were 725 feet long, 82 feet wide and a draft of 36 feet that would arrive 120 times a year. The opening of the old Brightman Street Bridge is 98 feet. The opening of the new bridge under construction, north of the proposed Weaver's Cove terminal, is 200 feet. The openings are not navigationally aligned. (Source: SouthCoastToday.com)
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Coast Guard Foundation to Honor USCG in Miami

The Coast Guard Foundation, a nonprofit organization committed to the education and welfare of all Coast Guard members and their families, announced today that

Maritime Broadband Opens Office in Greece

Maritime Broadband has expanded its worldwide footprint by opening an office, Maritime Broadband Hellas, in Athens, Greece. The new office addresses the growing

Renewable Energy: Schottel Tidal Turbines Ready For Use

In the last months Schottel  successfully tested its hydrokinetic turbines in Strangford Lough, Northern Ireland. The full-scale tests included 260 operating hours under realistic conditions.

LNG

Weak Oil Threatens US Export of LNG

Plunging global oil prices may turn hopes for cheap liquefied natural gas supplies from the United States into a costly disappointment for Asian buyers who have

Singapore’s MPA Discuss LNG Bunkering

The Maritime and Port Authority of Singapore (MPA), Antwerp Port Authority, Port of Rotterdam and Port of Zeebrugge participated in a Liquefied Natural Gas (LNG)

New Standard for LNG Cargo Containment Systems

Wilhelmsen Technical Solutions (WTS) said it has successfully completing the gas trial for the first LNG carrier built to a Boil Off Rate (BOR) of 0.08% per day.

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Offshore Oil Pipelines Salvage Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1324 sec (8 req/sec)