Conrad Announces Contract Modification

Monday, April 10, 2006
Conrad Industries, Inc. entered into a Memorandum of Understanding with the U.S. Army Engineer District, Philadelphia for the issuance of a modification for $4.3 million to increase the contract price of the contract entered into in September 2002 to design, construct, test and deliver four towboats. In addition, the agreement provides for time extensions to complete certain aspects of the contract. This agreement was reached to fully resolve and settle the claim filed by Conrad’s subsidiary, Orange Shipbuilding, in July 2005. The Corps has agreed to pay the settlement amount at the earliest possible date as funds become available. Conrad expects to receive the funds within the second quarter of 2006, although no assurances can be given.
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Finance

UASC Targets Expansion to Beat Container Market Blues

UASC expects to reach volume of 2.35 mln TEU in 2014 Global carriers still struggling with weak conditions United Arab Shipping Company (UASC) is on a major expansion drive,

Ecoships Claims 15% Ship Efficiency Gain

Ecoships introduced a customized version of the Six Sigma DMAIC approach to process and performance evaluation in order to optimize the energy-efficiency of the vessels under its management.

Singapore Bunker Meter Mandate Targets 'Frothy Fuel'

Singapore, the world's biggest bunkering port, plans to end the so-called "cappucino effect" in ship fuelling through new meters designed to stop suppliers from short-changing customers,

 
 
Maritime Security Naval Architecture Navigation Offshore Oil Port Authority Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1372 sec (7 req/sec)