Bluewater Purchases Vessel from Knutsen

Thursday, April 20, 2006
Bluewater Energy Services B.V. announced the purchase by Bluewater of the MT Hanne Knutsen tanker from Knutsen OAS Shipping AS. Delivery to Bluewater is expected to take place on or before June 30. The MT Hanne Knutsen was built in the Spanish shipyard Astilleros de Sestao and was delivered to Knutsen OAS Shipping AS in 2000. The vessel was designed as a typical North Sea shuttle tanker and has since been trading in Baltic ice regions and has also been in service as a shuttle tanker. The Hanne Knutsen has a storage capacity of 860,000 bbls cargo, and is a sister vessel of the Aasgaard C FSO. The hull structure offers considerably higher strength than standard tankers and is rated Ice Class 1A which is ideal for harsh environments. The vessel is provided with a DP2 class Dynamic Positioning capability with bow and stern thrusters and two main-propellers combined with special rudders. The two large generators (8 MW each) are driven by the ship's two main diesel engines which can be used as electric power generation for future FPSO operations.
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Tanker Trends

Ingram Barge Order 20 Tank Barges for 2015

Ingram Barge Company say they will be building 20 tank barges in 2015 to meet growing demand for chemical shipments. While most of the company’s recent tank barges have come through acquisitions,

Finland Grants Support to Three Small LNG Terminals

The Finnish government granted 65.2 million euros (84.22 million US dollar) in subsidies to build three small liquefied natural gas (LNG) terminals to cut on use

Senator Says 2015 Could Be Time for US Oil Export Bill

The top supporter in the U.S. Congress for reversing the 40-year ban on crude oil exports, Senator Lisa Murkowski from Alaska, said next year could be the time for a bill on lifting the restriction.

Navy

ONR Funds UW Oceanographic R/V Refit Contract

The US Department of Defense informs that the University of Washington (UW), Seattle, Washington, is being awarded a $12,776,050 cost reimbursement contract for

Navy, Other Agencies, Award Bio-refinery Contracts to 3 Firms

As part of a 2011 Presidential directive, the Departments of Navy, Energy, and Agriculture have announced that three companies have been awarded contracts to construct

AN/SPY-1 SSSA Completes Critical Design Review

The Critical Design Review (CDR) stage for AN/SPY-1 radar Solid-State Switch Assembly (SSSA)'s high voltage modulator completed Aug. 26, confirming that the

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Offshore Oil Pod Propulsion Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2177 sec (5 req/sec)