Aker Philadelphia Begins Tanker Construction

Wednesday, May 10, 2006
Aker Philadelphia Shipyard has commenced production on the third vessel in the ten-ship product tanker build program initiated in April 2005. Steel cutting for the ship, the seventh built by the yard since its opening nearly six years ago, was performed on one of the yard's two state-of-the-art plasma cutting machines. The third tanker vessel is scheduled to be completed in the fourth quarter of 2007. The first steel plates cut for the ship will be used in construction of the engine room of the 46,000 deadweight ton (dwt) product tanker. Upon completion, the tankers will be owned by American Shipping Corporation, a subsidiary of Aker American Shipping, and bareboat chartered to Overseas Shipholding Group, Inc (OSG). To date, six of the 10 tankers in the build program are under signed time charter, with two-ship agreements in place between OSG and Shell, BP and Tesoro. The first vessel in the series is expected to be delivered to OSG in the fourth quarter of this year.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter January 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

MHI's Entity to Oversee Material Handling Equipment, Engine and Turbocharger Businesses

Today Mitsubishi Heavy Industries, Ltd. (MHI) decided in principle to launch a new wholly owned entity to integrally oversee its current businesses in material

Globus Maritime Reclassifies Board Member

Globus Maritime Limited, a dry bulk shipping company, announced today that when Georgios Karageorgiou, a Class I director of Globus Maritime Limited  resigned on December 28,

First Panama Canal Water-Saving Basin Filled

The Panama Canal Authority (ACP) announced that the first water-saving basin of the Agua Clara Locks’ upper chamber has been filled to the required level in order

Shipbuilding

Crowley Christens 2nd LNG-ready Product Tanker

Crowley christens second of four newly built, LNG-ready product tankers for use in U.S. coastwise trade   Crowley Maritime Corp. has christened the second of

VT Halter Delivers ATB Tug to Bouchard

VT Halter Marine, Inc. announced the delivery of the M/V Morton S. Bouchard Jr., the first of the two 6,000 horsepower Twin Screw Articulated Tug Barge (ATB) tugs to Bouchard Transportation Co.

Damen Builds Cable Installer For Maersk Supply Service

New Damen-built vessel for Maersk Supply Service to undertake long-term charter with DeepOcean   A newbuild DP2 cable installation vessel, Maersk Connector, was

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Pipelines Pod Propulsion Port Authority Salvage Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0813 sec (12 req/sec)