ADSB Launches Navy Vessel

Monday, May 22, 2006
Abu Dhabi Ship Building launched its first Naval export order, a landing craft for the Royal Navy of Oman. It is the first time that a vessel for a Gulf Cooperation Council country has been built by another member of the regional grouping. The launching ceremony, at ADSB’s Musaffah (Abu Dhabi) shipyard, was attended by senior officers from the Oman and UAE navies. The 64 m landing craft, named Al Munassir, has been designed locally with special features to meet the Oman Navy’s operational requirements. The Navy placed the order with ADSB in February 2005. Fitting out will now take place and Al Munassir will be handed over after sea trials later this year. ADSB has previously built three similar landing craft for the UAE Navy but sees the Oman contract as a major breakthrough in its efforts to win new building contracts from regional Naval and Coast Guard authorities. “Since being formed ten years ago, Abu Dhabi Ship Building has gained a reputation for world class capabilities,” said ADSB Chairman Abdullah Nasser Al Mansouri. “We are in ongoing discussions with all the regional armed forces and there is now a general acceptance of the advantages of meeting their requirements, where possible, within the GCC countries. “We are delighted that the Royal Oman Navy selected ADSB for this important project and we look forward to also providing high quality naval vessels and support services in future for other GCC countries.” ADSB’s other current Naval projects include building six corvettes for the UAE Navy, the largest shipbuilding project ever undertaken in the Middle East. The 72 metre corvettes are a unique class of warship with multi-mission capabilities and will use the latest in weapons and sensor technology. They will be the largest steel hulled naval vessels ever built that will use only water jet propulsion.
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

AN/SPY-1 SSSA Completes Critical Design Review

The Critical Design Review (CDR) stage for AN/SPY-1 radar Solid-State Switch Assembly (SSSA)'s high voltage modulator completed Aug. 26, confirming that the

General Dynamics Wins US Navy Award for F/A-18 Mission Computers

General Dynamics Advanced Information Systems, a business unit of General Dynamics, was awarded a $16.2 million contract by the U.S. Navy to produce Type-3 Advanced

Phoenix International Awarded US$75-M Subsea Navy Contract

US Department of Defense inform that Phoenix International Holdings Inc., Largo, Maryland, is being awarded a $75,000,000 indefinite-delivery/indefinite-quantity,

Coast Guard

USCG Cutter in Oregon Spill Drill

The crew of Coast Guard Cutter Fir, a 225-foot buoy tender homeported in Astoria, Oregon, participated in a Spilled Oil Response System exercise near Blake Island, Washington, Wednesday.

USCG in Search of Missing Man in Lake Michigan

The Coast Guard is searching for a man who went missing on Lake Michigan, Tuesday. Missing is 48-year-old Joseph Kiehm from Milwaukee. Kiehm was last seen aboard his 26-foot white sailboat,

Lake Charles Tugboat Engine Room Fire Extinguished

The Coast Guard informs that along with the Black Bayou Fire Department it has responded to a tugboat on fire near Lake Charles, Louisiana. At approximately 1:15 p.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Pod Propulsion Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1137 sec (9 req/sec)