LNG Project focus on Security

Thursday, June 29, 2006
According to SJnews, while BP awaits the Supreme Court ruling to decide the fate of the planned liquefied natural gas (LNG) facility in NJ, more than 50 federal, state and local emergency officials toil over a plan to ensure the safe shipment of the liquid up the Delaware River. The transit management plan, to designate duties of local, state and federal officials for the safe shipment of 120 million gallons of LNG to the Logan facility each week, is required by the U.S. Coast Guard in order to begin construction of the plant. As it stands, the company is preparing a strong security system to guard against potential terrorist attacks or other attempts to breach security along the river. BP will employ tugboats with firefighting capabilities to escort each ship - carrying an estimated 40 million gallons of LNG - up portions of the river, according to BP personnel. Armed U.S. Coast Guard members will guide the ships through "sensitive" waterways, from the Delaware Bay to the Delaware Memorial Bridge, while local and state emergency personnel from Delaware, Pennsylvania and New Jersey monitor the ships' movement from land, BP officials said. BP's Crown Landing project is the first to undergo a new LNG approval process put in place by the U.S. Coast Guard last year, according to BP officials. The first phase of the process includes approval of the safe shipment of LNG on the river, or the Waterways Security Assessment (WSA), approved by the Coast Guard last December. The second phase maps out shipment plan details, the Transit Management Plan (TMP). BP officials expect to establish a solid shipment plan - to identify the cost and scope of security needs - by late 2007. Source: SJNews.com
Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

LNG

Tanker Retrofitted with Dual Fuel Engine

Caterpillar Marine informs it has begin a dual fuel engine retrofit conversion onboard the 472-foot Fure West tanker, owned by Furetank Rederi A/B. The MaK M 43

Canada's First LNG Ferry Launches with Bestobell Valves

Bestobell Valves is celebrating supplying cryogenic valves to Canada’s first LNG-fuelled ferry – the MV Armand-Imbeau II, which has recently been launched.   It

GasLog Orders Two LNG Carriers

GasLog Ltd. today announced that it has ordered two new 174,000 cubic meter LNG carriers from Hyundai Heavy Industries Co., Ltd. ("Hyundai") in South Korea.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Salvage Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1000 sec (10 req/sec)