USCG Activates Rescue 21 System in Gulf States

Tuesday, July 11, 2006
The U.S. Coast Guard announced Friday that on June 30 it began using the new Rescue 21 command, control and communications system along the Alabama, Mississippi and Florida coastlines. General Dynamics C4 Systems, is the prime contractor for development and deployment of the Rescue 21 system.

Advanced direction-finding capability, a critical component of Rescue 21, allows Coast Guard watchstanders to more accurately locate the source of a distress call. That capability also allows the Coast Guard to locate the source of hoax calls. Rescue 21 also includes a network of towers to help reduce coverage gaps in coastal areas and ensure more calls get through to the Coast Guard.

Proving its mettle following Hurricanes Katrina and Rita, is the Disaster Recovery System (DRS), a critical component of Rescue 21. A fully autonomous, rapidly deployable emergency communications package, it provides voice and data connectivity if a man-made or natural disaster destroys the existing communications infrastructure. The DRS connects to the Coast Guard Data Network (CGDN+) via satellite communications. For six months, it reliably provided one-way communications with mariners, in the southeastern portion of the Mississippi River and Gulf Coast region. Currently, four of the deployable systems are staged in Huntsville, Ala. for quick deployment.

The National Oceanic and Atmospheric Administration has predicted eight to 10 hurricanes in the Atlantic for 2006; at least half of which are expected to be the strength of Category Three storms. "Rescue 21 has been accepted at an especially critical time of year in the Gulf States," said Abel. "It provides vital technology to increase the capabilities of our Coast Guard crews at a vital time when summer search and rescue pace increases and tropical storms or hurricanes put mariners and coastal residents at risk," he said.

A $730 million acquisition project and the second largest within the Coast Guard, Rescue 21 will replace the Coast Guard's aging National Distress and Response System, built during the 1970s. Once fully implemented, Rescue 21 will cover 95,000 miles of U.S. coastline and inland waterways.

Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

First Supramax Vessel for Japan-Italy Venture

'DACC Tirreno' was delivered at the Oshima shipyard in Japan yesterday, the first of four Supramax bulk carriers for the dACC Maritime Limited fleet, the joint

Austal Graduates 48 4-Yr Apprentices

Austal USA combined two classes to graduate a total of 48 members of Austal’s cutting-edge four-year apprenticeship program yesterday at a formal ceremony held at the Arthur R.

BAE Systems to Expand San Diego Shipyard

BAE Systems announced it will invest approximately $100 million to expand drydocking capabilities at its San Diego shipyard.   The investment, which will include

Coast Guard

USCG Flush Ice down River Systems to Facilitate Shipping

The Coast Guard cutter fleet is flushing ice through the Great Lakes river systems to prevent ice jams and facilitate commercial shipping as the shipping season

Mediterranean Rescue Operations Strain Shipping

The Wall Street Journal ran a story yesterday describing how the increasing number of seaborne migrants making the journey from Africa to Europe has not only

Greek Ferry Still Stuck

The Greek ferry that ran aground just outside of port on the Aegean Island of Kassos Wednesday night is still stuck. The 227 passengers and 55 crew aboard the

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Pod Propulsion Port Authority Ship Repair Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1252 sec (8 req/sec)