Troubled Yard Ordered to Hand Over Ship

Thursday, July 13, 2006
It has been reported that the shipbuilder Swan Hunter will be ordered to hand over its last remaining warship - which will then be completed at a rival yard in Scotland. The Royal Fleet Auxiliary vessel, the Lyme Bay, will be handed over to BAE Systems at Govan, in a move which is feared could spell the end of shipbuilding at Swan Hunter. The MoD, had become increasingly concerned about the spiralling costs of the dock landing ship contract. Swan Hunter was forced to renegotiate its 160m contract with the Government at the end of 2004 following problems adaptation an off-the-shelf design for the Largs Bay and Lyme Bay vessels. Source: The Northern Echo
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Vard Orders Parat Electric Steam & Hot Water Boilers

During the last month, PARAT Halvorsen AS has collected four new boiler plant orders from the Vard Group and their multipurpose platform ships of Vard 1 08 design.

Newport News Selects Paramarine Design Software

QinetiQ’s Paramarine Ship and Submersible Design Software has been selected by Newport News Shipbuilding (NSS) as its primary naval architectural software. QinetiQ

VOSTA LMG Secures Order From Boskalis

VOSTA LMG has been awarded an order for efficient dredge ball joints from maritime services company Royal Boskalis Westminster. The order consists of a series

Shipbuilding

ClassNK Head Attends KOTC Delivery Ceremony

Noboru Ueda, Chairman and President of ClassNK attended the delivery ceremony for the M/T Al Yarmouk, constructed at Daewoo Shipbuilding & Marine Engineering Co.

Vard Orders Parat Electric Steam & Hot Water Boilers

During the last month, PARAT Halvorsen AS has collected four new boiler plant orders from the Vard Group and their multipurpose platform ships of Vard 1 08 design.

N-KOM Lays Keel for Qatar’s First Liftboat

Nakilat-Keppel Offshore & Marine (N-KOM) has achieved another milestone with the keel laying of its first liftboat newbuild project, awarded in July 2014 by long-time

 
 
Maritime Contracts Maritime Security Offshore Oil Pipelines Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1231 sec (8 req/sec)