Troubled Yard Ordered to Hand Over Ship

Thursday, July 13, 2006
It has been reported that the shipbuilder Swan Hunter will be ordered to hand over its last remaining warship - which will then be completed at a rival yard in Scotland. The Royal Fleet Auxiliary vessel, the Lyme Bay, will be handed over to BAE Systems at Govan, in a move which is feared could spell the end of shipbuilding at Swan Hunter. The MoD, had become increasingly concerned about the spiralling costs of the dock landing ship contract. Swan Hunter was forced to renegotiate its 160m contract with the Government at the end of 2004 following problems adaptation an off-the-shelf design for the Largs Bay and Lyme Bay vessels. Source: The Northern Echo
Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Anglo-Eastern Signs Turbocharger Maintenance Deal

MAN PrimeServ Turbocharger, part of MAN Diesel & Turbo’s service division, has signed a Premium Turbocharger Maintenance Contract with Anglo-Eastern Ship Management.

Electric & Hybrid Propulsion Ordered fir CMAL Ferry

Imtech Marine informs it has been awarded a third contract to supply the electric and hybrid propulsion system for a hybrid ferry operated by Caledonian Maritime Assets Ltd (CMAL) of Scotland.

Asia Dry Bulk-Capesize Rates Mixed on Uncertainty

Capesize rates slide after hitting 5-month high. Rates for capesize bulk carriers eased this week after hitting their highest since December, and could come

Shipbuilding

ERMA Bullish on Ballast Water Treatment

After having delivered several BWTS systems in Kita Nihon shipyard in Japan, one more ERMA FIRST BWTS was successfully installed onboard the Bulk Carrier M/V SCARABÉ(DWT: 60,

USS Freedom (LCS 1) Completes Rough Water Trials

The littoral combat ship USS Freedom (LCS 1) completed Seakeeping and Structural Loads Trials, commonly referred to as Rough Water Trials (RWT) in late March the Navy reported May 21.

Conrad Announces Management Team Changes

Conrad Industries, Inc. announced the appointment of Scott J. Theriot as Executive Vice President and Chief Operating Officer.   Johnny Conrad, President and Chief Executive Officer,

 
 
Maritime Contracts Maritime Security Maritime Standards Navigation Offshore Oil Port Authority Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1223 sec (8 req/sec)