Mississippi River Main Channel Reopened

Tuesday, July 11, 2006
The AP has reported that the main channel of the Mississippi River above Winona has reopened. The channel reopened after being closed since a tugboat ran aground Saturday morning.

The lockmaster at Lock and Dam Five in Minneiska says the accident about two miles north of the dam kept traffic from getting past. It is said that two private dredge operators were finally able to free the towboat and its barges after two-and-a-half days. The towboat Richard Baker ran aground in an area where the river is being drawn down. Source: AP

Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

AOD Orders 2 Jack-up Rigs at CSSC Huangpu Wenchong

CSSC Huangpu Wenchong Shipbuilding Company has won an order to build a pair of jack-up drilling rigs for Alliance Offshore Drilling (AOD), subsidiary of Hong Kong-listed TSC Group.

Tuco Reveals New Naval Interceptor Vessel Design

Following last week’s Seawork exhibition on workboats and small military and security vessels, Tuco Marine of Denmark reveals its newest vessel in the ProZero line.

Austal Starts Next US Littoral Combat Ship

Austal and the U.S. Navy held a keel-laying ceremony today for the future USS Manchester (LCS 14), marking the first significant milestone in its construction.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Pipelines Port Authority Salvage Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1913 sec (5 req/sec)