Mississippi River Main Channel Reopened

Tuesday, July 11, 2006
The AP has reported that the main channel of the Mississippi River above Winona has reopened. The channel reopened after being closed since a tugboat ran aground Saturday morning.

The lockmaster at Lock and Dam Five in Minneiska says the accident about two miles north of the dam kept traffic from getting past. It is said that two private dredge operators were finally able to free the towboat and its barges after two-and-a-half days. The towboat Richard Baker ran aground in an area where the river is being drawn down. Source: AP

Maritime Reporter October 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Henderson, Hanes & Associates Opens Doors in Miami

Ocean Engineering/ Naval Architecture Firm Brings Innovation to the Mega Yacht Community The Miami-based ocean engineering and naval architecture firm of Henderson & Associates, Inc.

Austal Launches Trenton (JHSV 5)

Second Joint High Speed Vessel to be launched at Austal in 2014 On September 30, 2014, Austal USA successfully completed the launch process of Trenton (JHSV

Going Big for Sustainability

Orkot Marine Bearings, developed and manufactured by Trelleborg Sealing Solutions, contribute to the build of the world’s largest and most efficient containerships,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1072 sec (9 req/sec)