Electric Boat Awarded Contract Modification

Friday, July 28, 2006
Electric Boat Corp., Groton, Conn., is being awarded a $6,300,000 modification to previously awarded contract for procurement of long lead time special hull treatment material in support of USS Texas (SSN 775) post shakedown availability. Work will be performed in Groton, Conn., and is expected to be completed by December 2007. Contract funds will not expire at the end of the current fiscal year. The Supervisor of Shipbuilding, Conversion and Repair, Groton Conn., is the contracting activity.
Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Imabari to Construct Newbuilding Dry Dock

In order to accommodate construction of Ultra-Large newbuilding vessels including recently secured 20,000TEU Mega container ships (about 400m in length and about 59m breadth),

Long Beach Port to Boost Power, Speed Clearance

Port of Long Beach Chief Executive Jon Slangerup on Thursday unveiled ambitious plans for congestion-beating smart systems for cargo movement and an all-out

31 ARENA Projects Completed

ARENA has invested $1 billion in more than 230 projects, fellowships and scholarships that are paving the way for a more diverse energy future for Australia.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Offshore Oil Pipelines Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1163 sec (9 req/sec)