Electric Boat Awarded Contract Modification

Friday, July 28, 2006
Electric Boat Corp., Groton, Conn., is being awarded a $6,300,000 modification to previously awarded contract for procurement of long lead time special hull treatment material in support of USS Texas (SSN 775) post shakedown availability. Work will be performed in Groton, Conn., and is expected to be completed by December 2007. Contract funds will not expire at the end of the current fiscal year. The Supervisor of Shipbuilding, Conversion and Repair, Groton Conn., is the contracting activity.
Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

President Pryor Retires from ExxonMobil Chemicals

Stephen D. Pryor, president, ExxonMobil Chemical Company and vice president of Exxon Mobil Corporation, has elected to retire on January 1, 2015, after more than 44 years of service.

Asia Tanker, VLCC Rates Could Climb

Charterers to release 30 Middle East VLCC cargoes next week. VLCC market buoyed by upbeat Suezmax, Aframax sectors. Rates for very large crude carriers (VLCCs)

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Pipelines Port Authority Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0812 sec (12 req/sec)