Electric Boat Awarded Contract Modification

Friday, July 28, 2006
Electric Boat Corp., Groton, Conn., is being awarded a $6,300,000 modification to previously awarded contract for procurement of long lead time special hull treatment material in support of USS Texas (SSN 775) post shakedown availability. Work will be performed in Groton, Conn., and is expected to be completed by December 2007. Contract funds will not expire at the end of the current fiscal year. The Supervisor of Shipbuilding, Conversion and Repair, Groton Conn., is the contracting activity.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter January 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

VT Halter Delivers ATB Tug to Bouchard

VT Halter Marine, Inc. announced the delivery of the M/V Morton S. Bouchard Jr., the first of the two 6,000 horsepower Twin Screw Articulated Tug Barge (ATB) tugs to Bouchard Transportation Co.

COSCO Also Eyes Greek Train Network

China's COSCO already the sole bidder for Greece's Piraeus Port. Buying both would give COSCO a European transhipment hub. China's COSCO is expected to make

Asia-Europe Box Rates Down 8 pct

Shipping freight rates for transporting containers from ports in Asia to Northern Europe fell by 8.1 percent to $431 per 20-foot container (TEU) in the week ended on Friday,

 
 
Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0537 sec (19 req/sec)