LNG Project Costs Rise 21%

Thursday, September 07, 2006
Woodside Petroleum Ltd said costs for the planned phase five expansion of its North-West Gas liquefied natural gas project are estimated to have risen by 21 pct to 2.42 bln aud because of higher labor charges. The company, 34 % owned by the Royal Dutch Shell group, said the spike in costs is largely due to a sharp rise, internationally, in labor charges in the construction industry. Woodside operates the project and is a one sixth owner alongside Royal Dutch Shell.

Already more than 14 bln aud has been spent on the LNG project's development over a 20-year period, making it a major LNG project by world standards. The fifth phase expansion includes the construction of an LNG processing facility with annual capacity of 4.2 mln metric tons of liquefied gas for export, largely to Asian markets.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter February 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Cruise Ship Trends

Interior Facelift for Queen Mary 2

Cunard’s luxurious flagship, the iconic 2,620 passenger ocean liner Queen Mary 2, will undergo an interior refit at the hands of McCue Marine during a 25-day multimillion-pound

USCG to Inspect Storm-damaged Anthem of the Seas

The storm-damaged Royal Caribbean cruise ship Anthem of the Seas is scheduled to return to New York Harbor Wednesday evening where it will be met by a team of inspectors from U.

Royal Caribbean Ship Thrashed by Storm Returns on Wednesday

A Royal Caribbean cruise ship forced to turn back early after being battered by an Atlantic storm was expected to return to its New Jersey port at 9 p.m. on Wednesday (0200 GMT Thursday),

LNG

Cautious Optimism on Pacific NorthWest LNG Report

Canadian Environmental Assessment Agency (CEAA)  has ruled that Pacific NorthWest LNG’s project in British Columbia would likely harm harbour porpoises and contribute to climate change,

N.America's First LNG Marine Fuel Terminal Opens

Harvey Gulf announced the opening of the first marine LNG fueling terminal in North America. Less than a year after the delivery of the M/V Harvey Energy, America’s first LNG-powered vessel,

FSRU Golar Tundra Sold to Golar LNG Partners

Golar LNG Limited has entered into a purchase agreement to sell the Golar Tundra, a floating storage and regasification unit (FSRU), to Golar LNG Partners LP for a sale price of $330 million.

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Pod Propulsion Port Authority Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0606 sec (16 req/sec)