LNG Project Costs Rise 21%

Thursday, September 07, 2006
Woodside Petroleum Ltd said costs for the planned phase five expansion of its North-West Gas liquefied natural gas project are estimated to have risen by 21 pct to 2.42 bln aud because of higher labor charges. The company, 34 % owned by the Royal Dutch Shell group, said the spike in costs is largely due to a sharp rise, internationally, in labor charges in the construction industry. Woodside operates the project and is a one sixth owner alongside Royal Dutch Shell.

Already more than 14 bln aud has been spent on the LNG project's development over a 20-year period, making it a major LNG project by world standards. The fifth phase expansion includes the construction of an LNG processing facility with annual capacity of 4.2 mln metric tons of liquefied gas for export, largely to Asian markets.

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Cruise Ship Trends

Norwegian Buys Ship from Princess Cruises

Norwegian Cruise Line Holdings Ltd. announces fleet expansion for Oceania Cruises in 2016; Sirena to join sister ships Insignia, Regatta and Nautica   Norwegian Cruise Line Holdings Ltd.

MSC Cruises Advance Onboard Wi-Fi System

MSC Cruises has started a fleet-wide optimization installed by Marlink to improve shipboard VSAT (Very Small Aperture Terminal) connectivity. MSC Cruises said it

Fincantieri Sign MoUs with Carnival & CSSC

Fincantieri, the world leader in the construction of cruise ships, has signed two memorandums of understanding, respectively with Carnival Corporation, the world’s largest cruise line,

LNG

World’s First LNG-Ready Ultra Large Container Ship Named

The race is on in global maritime circles to be the “world’s first” in every aspect of environmental friendliness, particularly in regards to the incorporation of LNG as fuel onboard commercial ships.

ClassNK Approves Niigata Dual-fuel Engine Design

Classification society ClassNK has granted approval to the design of the new 28AHX-DF dual-fuel engine developed by Niigata Power Systems Co., Ltd. The new engine

Massive LNG Absorber Shipped to Malaysia

Successful transport of 1,480t absorber for biggest LNG plant worldwide in Malaysia.   1,480 tons and a high center of gravity made the transport of an absorber

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Ship Simulators
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1972 sec (5 req/sec)