APL: Port Infrastructure Deter India’s Progress

Friday, September 15, 2006
A lack of infrastructure and high port and inland costs continue to limit India’s economic progress, a senior executive of global container transportation leader, APL, told a high-level shipping industry gathering this week. Addressing the Southern Asia Ports, Logistics and Shipping conference in Mumbai, APL President for South Asia, Kenneth Glenn, said that as global sourcing and manufacturing continues to shift to Asian locations, foreign investors will choose to invest near ports with world-class efficiency in port infrastructure. Mr Glenn said: "If India can develop thriving retail and manufacturing sectors to rival its services sector, the sky is the limit in terms of its economic potential. But currently, inadequate infrastructure and high costs are hurting its development as an exporter to the rest of the world." Glenn said that by late 2008 some 25% of world container ship capacity will be comprised of vessels of at least 6,000 TEU (twenty-foot equivalent units) but that India does not yet have a port that can handle this class of ship. "Until India can develop these type of global class facilities, it will not fulfill its cargo carrying potential," said Mr Glenn. Last year, Mumbai’s Jawal Nehru Port Trust (JNPT) was the only Indian entry in the list of the world’s top 100 container ports at number 36, with Chennai next at 109. "This suggests that investment in ports is too fragmented and spread across too many sites of insufficient scale," said Glenn. "When India’s ports are assessed against the attributes of a world-class port, they do not stack up well, lacking many of the characteristics international ship operators look for in order to increase vessel calls." Glenn pointed out that the imbalance of container trade towards JNPT, which accounts for around 60% of total Indian volumes, is creating acute congestion. However, he said that simply adding more port capacity at multiple locations is not the answer, citing a recent analysis conducted by leading industry analyst Drewry for APL.
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ports

URAG Orders Two ASD Tugs from Damen

URAG, a German port and offshore towage provider based in Bremerhaven, has placed an order for two Damen ASD 2411 tugs. The contract was signed at the SMM exhibition in Hamburg.

For Europe's LNG Ports, Russia Gas Fears and US Exporters Buoy Demand

Gas buyers nervous of Russia cutting supply are helping solve Europe's problem of too many underused liquefied natural gas (LNG) terminals, as they seek space at France's Dunkirk plant.

Liebherr Sees Growing Demand for Harbor Cranes in Latin America

Several new deliveries to Latin America; strong 2014 year for Liebherr mobile harbor cranes Liebherr said its mobile harbor crane population in Latin America

LNG

For Europe's LNG Ports, Russia Gas Fears and US Exporters Buoy Demand

Gas buyers nervous of Russia cutting supply are helping solve Europe's problem of too many underused liquefied natural gas (LNG) terminals, as they seek space at France's Dunkirk plant.

Ferus Smit Building LNG Powered Cement Carrier

The first unique LNG powered ship that Ferus Smit has on order for Erik Thun A.B. will be built and equipped as a dedicated cement carrier. The ship will be delivered to the joint venture JT cement,

China Orders More MAN Dual-Fuel Units

51/60DF engines to power LNGCs MAN Diesel & Turbo has announced a further order for its MAN 51/60DF engine. After a longer period of evaluation, an international consortium,

 
 
Maritime Security Maritime Standards Naval Architecture Navigation Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1922 sec (5 req/sec)