Bluewater Wants to Bring Offshore Wind Farm to Del.

Thursday, October 19, 2006
Bluewater Wind, a developer of off-shore wind energy, is one of the companies competing for a long-term energy contract with Delmarva Power. Delmarva Power is requesting a proposal for an energy provider to help stabilize the price of energy in the state. Bluewater Wind is one of the companies competing for the contract, along with NRG, which has proposed expanding its coal facility on the Indian River Bay. Delmarva Power will choose an energy company in November. Bluewater Wind is proposing building as many as three wind farms that would generate a total of 600 megawatts of energy. While the price of fuel is free, the price of building the windmills will come to about $800 or $900 million.

The University has been studying the wind off the coast of Delaware for 20 years. From that research, Kempton has concluded that there is enough wind for a wind farm that could generate 14,000 megawatts of energy, enough to power Delaware and sell leftover energy to neighboring states. The wind is strongest near Cape Henlopen and some parts of Rehoboth Beach, according to the University of Delaware's research, but Bluewater Wind has not pinned down locations for its proposed wind farms.

Even if Delmarva Power awards the contract to Bluewater Wind in November, a wind farm would be about least three years off. Bluewater Wind estimates that the project will take two full years to permit. It will look at environmental studies and try to minimize the effect on birds and fish, Lanard said. Constructing the wind farms would take about 180 days. The amount of power generated by a wind farm would fluctuate with wind speeds. Source: Delaware Wave

Maritime Reporter August 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

AET Names DP Shuttle for Statoil Charter

Petroleum tanker owner and operator AET today named its newest vessel, a 120,000 DWT DP2 shuttle tanker, Eagle Bergen.    Eagle Bergen is the second of two vessels

Austal Delivers Final Cape Class Patrol Boat

Cape York, the last of eight new Cape Class Patrol Boats for Australian Border Force (formerly Australian Customs and Border Protection) has been delivered by shipbuilder

HMS Prince of Wales’ Final Carrier Block Delivered

The final sections of the second Queen Elizabeth Class aircraft carrier produced by Cammell Laird arrived at Babcock Rosyth Facilities in Fife on Thursday, September 3,

 
 
Maritime Contracts Maritime Security Naval Architecture Offshore Oil Pipelines Salvage Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3685 sec (3 req/sec)