Lower Willamette River Dredged Material Management Plan

Friday, October 27, 2006
The US Army Corps of Engineers issued a notice stating that it intends to prepare an environmental impact statement for the Lower Willamette River dredged material management plan. The notice states that comments on this proposed project should be submitted by November 27, 2006. 71 Fed. Reg. 63005 source: HK Law
Maritime Reporter June 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Chinese PM Inks 2 Agreements During CMA CGM Visit

The CMA CGM Group hosted the Chinese Prime Minister, the French Foreign Affairs Minister and a ministerial delegation at its headquarters in Marseilles, July 1, the global shipping company announced.

GTT Records Order for 2 LNG Tankers

GTT receives a new order from Hyundai Samho Heavy Industries for two LNGCs for Teekay   GTT, a designer of membrane containment systems for the maritime transportation

Crowley Takes Over Management of MSC Ships

Crowley strengthens relationship with U.S. Navy, completes turnover of Military Sealift Command T-AGOS/T-AGM fleet   Crowley Maritime Corp. announced its global

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2307 sec (4 req/sec)