ASRY Delivers Tanker

Tuesday, November 07, 2006
According to KUNA, Bahrain-based Arab Shipbuilding and Repair Yard Company delivered an oil tanker to Kuwait Oil Tanker Company. The delivery ceremony was attended by Kuwaiti Ambassador to Bahrain Sheikh Azzam Mubarak Al-Sabah, Chairman of the Bahraini company Eid Abdullah Yussef, and Sheikh Ali Hamoud Al-Sabah, a representative of Kuwait Oil Tanker Company. Designed upon a request from the Kuwaiti company, the $5m tankers-6 is 35 meters long and nine meters wide, and has a crew of six sailors. It has lifting and haulage capacities of six tons and ten tons respectively. It is also equipped with updated systems able to separate water from oil in order to preserve sea environment. Tankers-6 can carry out several missions required by giant oil tankers, including transporting equipment and water and supplying the fleet of tankers.
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Tanker Trends

Ingram Barge Order 20 Tank Barges for 2015

Ingram Barge Company say they will be building 20 tank barges in 2015 to meet growing demand for chemical shipments. While most of the company’s recent tank barges have come through acquisitions,

Finland Grants Support to Three Small LNG Terminals

The Finnish government granted 65.2 million euros (84.22 million US dollar) in subsidies to build three small liquefied natural gas (LNG) terminals to cut on use

Senator Says 2015 Could Be Time for US Oil Export Bill

The top supporter in the U.S. Congress for reversing the 40-year ban on crude oil exports, Senator Lisa Murkowski from Alaska, said next year could be the time for a bill on lifting the restriction.

Environmental

MHPS's DeNOx System For Power Plant in Poland

Mitsubishi Hitachi Power Systems (MHPS) has received an order from ENEA Wytwarzanie S.A., a power producer in Poland, for two sets of selective catalytic reduction

Voith Hydropower Equipment for Thailand's Storage Plant

Voith has been awarded a new contract to supply the complete electromechanical equipment for a pumped storage power plant in Thailand. The order for the extension

HERCULES-2 Phoenix Rises from the Ashes

Wärtsilä Corporation advises that the HERCULES R&D programme to develop large engine technologies, which was initiated in 2004 as a joint vision by the two major European engine manufacturing groups,

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Pod Propulsion Ship Electronics Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.2104 sec (5 req/sec)