Cutter to be Christened

Friday, November 10, 2006
The 418-foot Bertholf is the first of eight deepwater cutters the Coast Guard has ordered from Northrop Grumman Ship Systems in Pascagoula Mississippi in the largest recapitalization effort in the service's history. The cutters are designed to accommodate the Coast Guard's new multifaceted missions of providing homeland security, national defense and marine and environmental protection, Glenn said. Northrop Grumman teamed with Lockheed Martin to develop the vessels in a multibillion dollar effort to replace the Coast Guard's aging fleet. Taylor said outgoing Secretary of Defense Donald Rumsfeld reduced the number of vessels in the Navy, threatening the viability of the nation's shipbuilding industry. He said Rumsfeld, who announced his resignation Wednesday shortly after it became apparent that Democrats had taken control of Congress, cut the Navy fleet by about 50 ships. The Bertholf will be the Coast Guard's first new high-endurance cutter in 35 years, Glenn said. The service's last 378-foot high endurance cutter -- the USCGC Midgett -- was built at Northrop Grumman's Louisiana shipyard in 1971, Glenn said. Taylor said the current fleet is so old that it's becoming cost prohibitive to keep the vessels seaworthy. The Bertholf will be able to launch and recover two rigid inflatable rescue boats and has a flight deck capable of accommodating manned and unmanned helicopters. The vessel is named Bertholf in honor of the Coast Guard's first commandant, Ellsworth Price Bertholf. Bertholf helped implement the merger of the Revenue Cutter Service and U.S. Life Saving Service in 1915 under President Woodrow Wilson. He chose Coast Guard as the name for the new agency. Source: AP

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Coast Guard

Grounded Bulker Repaired, Heads for Japan

The Captain of the Port for Oregon and southern Washington canceled the captain of the port order on the motor vessel Sparna allowing the vessel to leave its mooring at Kalama, Wash.

Towing Vessel Inspection Bureau Elects New Leaders

Towing Vessel Inspection Bureau Holds Annual Membership Meeting; Elects New Leadership and Votes to Proceed with a Third Party Organization Application to the Coast

Bulker Loses Propulsion off California

The U.S. Coast Guard is monitoring a 587-foot bulk carrier Ultra Lascar after the ship lost propulsion at 10:20 a.m., approximately five miles offshore from Daly City, Calif.

 
 
Maritime Contracts Maritime Standards Navigation Offshore Oil Pod Propulsion Port Authority Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0623 sec (16 req/sec)