Bay Bridge Enterprises Gets Latest Ghost Fleet Contract

Monday, November 13, 2006
MarAd will pay Bay Bridge Enterprises $494,000 to remove the Vulcan and tow it to its Chesapeake salvage yard on the Elizabeth River within 45 days. The Vulcan is a former Navy repair ship built in 1941. The Vulcan will be recycled for steel. The company will also remove and dispose of waste fuels and other potential pollutants on the ship. Bay Bridge Enterprises has gotten several contracts to scrap Ghost Fleet ships from the Maritime Administration.
Maritime Reporter September 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Cruise Ship Trends

Abu Dhabi Ports Welcomes New Cruise Season

As Abu Dhabi's new Zayed Port cruise terminal opens by the end of this year, the number of cruise ships docking in Abu Dhabi is set to increase by a fifth this season, reports the National.

Cruise Critic Awards Best Cruise Lines of 2015

Online cruise guide Cruise Critic has announced the winners of its annual Editors' Picks Awards for 2015, revealing the industry's top performers in a variety of different categories.

Becker Marine, Kotug Sign MOU for LNG Hybrid Barge

Press release - Becker Marine Systems and KOTUG signed a Memorandum of Understanding to launch a LNG Hybrid Barge in the Port of Rotterdam with effect from June 2017.

Maritime Contracts Naval Architecture Offshore Oil Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0935 sec (11 req/sec)