U.S. Coast Guard's First National Security Cutter Christened

Monday, November 13, 2006
The first new U.S. Coast Guard high endurance cutter to be built in more than 35 years was christened Bertholf (WMSL 750) before 1,000 enthusiastic guests at Northrop Grumman's shipyard. The Veterans Day christening ceremony of the Coast Guard's first National Security Cutter (NSC) honored Coast Guard veterans several of whom attended the ceremony. As she smashed the bottle of champagne across the new ship's bow, Meryl Chertoff, ship's sponsor and wife of Department of Homeland Security Secretary Michael Chertoff, proclaimed, "Bless this ship and all who sail in her!"

U.S. Rep. Gene Taylor (D-Miss.), delivered remarks honoring the U.S. Coast Guard personnel and veterans at the ceremony. The name Bertholf honors the U.S. Coast Guard's first Commandant, Ellsworth Price Bertholf (1866-1921). On Jan. 28, 1915, when President Woodrow Wilson signed a law consolidating the Revenue Cutter Service and the U.S. Life Saving Service, he accepted Bertholf's suggestion that 'Coast Guard' was the logical name for the combined agencies. As the first commandant, Bertholf was instrumental in implementing the successful merger of the two services.

The cutter is a 418-foot ship with a 4,300-ton displacement at full load. Powered by a twin screw combined diesel and gas turbine power propulsion plant, the NSC is designed to travel at 28 knots maximum speed. The cutter includes an aft launch and recovery area for two rigid hull inflatable boats, a flight deck to accommodate a range of manned and unmanned rotary wing aircrafts, and state-of-the-art command and control electronics.

The cutter was designed to satisfy the Coast Guard's multi-mission responsibilities in homeland security, national defense, marine safety and environmental protection. This class of cutters will play an important role in enhancing the Coast Guard's operational readiness, capacity and effectiveness at a time when the demand for its services has never been higher. In partnership with the U.S. Coast Guard, Northrop Grumman and Lockheed Martin, the joint venture partners of Integrated Coast Guard Systems, have been working side-by-side to design a ship that is not only capable and flexible, but also an economical and enduring platform.

Maritime Reporter April 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Container Ships

Long Beach Cargo Rises Sharply in March

Port of Long Beach sees jump in shipments with easing of congestion   Cargo surged upward in March at the Port of Long Beach with a 32 percent increase over the same month last year,

Container Volumes Jump at Port of LA

Year-over-year Port of Los Angeles container volumes for March rise by 17 percent; second busiest month in port’s history   March containerized cargo volumes at the Port of Los Angeles increased 17.

Georgia Port Increases Container Traffic

The Georgia Ports Authority increased containerized cargo in March by 27.8 percent compared to the same month a year ago, for an additional 72,499 20-foot equivalent container units (TEUs).

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Navigation Pod Propulsion Port Authority Salvage Ship Electronics Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1005 sec (10 req/sec)