Seaspan Accepts Delivery of Vessel

Thursday, December 07, 2006
Seaspan Corporation announced the delivery of its 22nd vessel, the Maersk Marystown, a 4800 TEU containership built in 1989. The vessel was purchased from A.P. Moller Maersk A/S and will be time chartered back to APMM for five years from delivery. APMM has options to extend the charter by up to four years from the end of the firm charter period. The Maersk Marystown, formerly named the Maren Maersk, is the third of four sister vessels to be purchased from and chartered back to APMM.
Maritime Reporter March 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Coast Guard

USNS Spearhead Delivers Materials to Ghana Charities

The U.S. Navy’s joint high-speed vessel USNS Spearhead (JHSV 1) delivered wheelchairs and medical supplies to Ghanaian non-governmental organizations March 26, 2015.

USCG Flush Ice down River Systems to Facilitate Shipping

The Coast Guard cutter fleet is flushing ice through the Great Lakes river systems to prevent ice jams and facilitate commercial shipping as the shipping season

Mediterranean Rescue Operations Strain Shipping

The Wall Street Journal ran a story yesterday describing how the increasing number of seaborne migrants making the journey from Africa to Europe has not only

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Navigation Offshore Oil Pod Propulsion Salvage Ship Electronics Ship Repair Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0982 sec (10 req/sec)