Stena Atlantica to be Named in Dubai

Thursday, December 14, 2006
The ice-classed oil tanker, Stena Atlantica, will be named in Dubai. The vessel has been built in compliance with Swedish/Finnish Ice Class notation 1 A, meaning that it can be safely maneuvered in difficult ice conditions. The naming ceremony will take place at the Dubai Dry Docks in the presence of a large number of guests from all over the world. The vessel’s Godmother will be Outi Löw, the wife of Michael G:son Löw, President and CEO of Sweden’s largest oil company, Preem Petroleum. Stena Atlantica is known as a Stena Ice-Aframax. It is 250 metres in length, 44 metres across its beam and has a capacity of 115 000 dwt. It was built at the Samsung Heavy Industries Shipyard in S. Korea and she sailed from there for Dubai on 14th November.

Having berthed at the Dubai Dry Docks, the Stena Atlantica was upgraded significantly, making it suitable for navigating ice-covered seas. The main ingredient in this upgrade was ‘icebreaker paint’, applied to the hull below the water line. Stena Atlantica has also been decked out with Stena Bulk’s own polar bear design on its sides. From Dubai, the Stena Atlantica will sail for Sikka, India where it will load gas oil, then sail through the Suez Canal and on to Rotterdam for discharging. From there, she will regulary carry crude oil from Russian oil port Primorsk, deep in the Gulf of Finland, to the European continent and the USA. Russian oil exports from Primorsk have risen from 12 million tons in 2001 to 65 million tons in 2006. During 2007, this figure is expected to increase to 70 million tons.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter July 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Hyundai Bags NZ Defence Order

Hyundai Heavy Industries (HHI), the world’s largest shipbuilder, has won an order to build a 23,000 ton class logistics support vessel for New Zealand Defence

LNG: Did the Greeks Get it Wrong?

In December 2013, Alibra’s market report front page read: “When in shipping, do as the Greeks do.” At that time, Alibra was referring to the fact that 31% of the

Ithaca’s FPF-1 platform to be moved to Stella field

Ithaca Energy Inc. reports that the "FPF-1" floating production facility has completed the required inclination test as planned and departed the Remontowa shipyard in Gdansk, Poland.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Pod Propulsion Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0657 sec (15 req/sec)