Pilot's License Suspended Following Damage to LNG Facility

Friday, January 05, 2007
An administrative law judge has suspended Pilot John C. McCarthy III's license Friday for eight months, with additional 12 months probation, after ruling that the Coast Guard proved its case of negligence and misconduct against him. The judge's decision stemmed from a March 14, 2006, incident on the Savannah River where the tank vessel Charleston, piloted by McCarthy, passed the liquefied natural gas facility on Elba Island at a speed in excess of 14 knots during an LNG transfer. The surge resulting from the vessel's speed caused an emergency dock shutdown, cargo hose separations, the collapse of a gangway, and mooring lines to part. All emergency equipment at the LNG facility functioned as designed and no LNG was released as a result of the damage. Following a comprehensive investigation, the Coast Guard pursued action against McCarthy's license due to concern that his negligence posed a hazard to navigation and based on the pilot's past history, which included three previous proved charges for negligence. In addition to the action taken against McCarthy, the Coast Guard determined the Captain of the tank ship CHARLESTON was also negligent in his role and was issued a letter or warning in lieu of suspension or revocation.

The Coast Guard is responsible for navigational safety on the Savannah River and enforces a Regulated Navigation Area to ensure the safety and security of LNG operations. As a result of this case, the Coast Guard has further clarified guidance for the port. Namely, inbound and outbound vessels transiting past a moored LNG ship must actively communicate with them to determine the need to deploy stand-by towing vessels as emergency situations arise. The Coast Guard routinely reviews it's guidance for LNG operations with input from the port community to account for changing conditions and to ensure continued safe and secure LNG operations.

Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Long Beach Port to Boost Power, Speed Clearance

Port of Long Beach Chief Executive Jon Slangerup on Thursday unveiled ambitious plans for congestion-beating smart systems for cargo movement and an all-out

31 ARENA Projects Completed

ARENA has invested $1 billion in more than 230 projects, fellowships and scholarships that are paving the way for a more diverse energy future for Australia.

Gazprom, OMV Ink Additional Deal

Vienna hosted today the signing of an Addendum to the existing contract for gas supply to Austria between Alexander Medvedev, Deputy Chairman of the Gazprom Management Committee and Gerhard Roiss,

Legal

Imabari to Construct Newbuilding Dry Dock

In order to accommodate construction of Ultra-Large newbuilding vessels including recently secured 20,000TEU Mega container ships (about 400m in length and about 59m breadth),

31 ARENA Projects Completed

ARENA has invested $1 billion in more than 230 projects, fellowships and scholarships that are paving the way for a more diverse energy future for Australia.

Gazprom, OMV Ink Additional Deal

Vienna hosted today the signing of an Addendum to the existing contract for gas supply to Austria between Alexander Medvedev, Deputy Chairman of the Gazprom Management Committee and Gerhard Roiss,

 
 
Maritime Contracts Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Ship Electronics Ship Repair Ship Simulators Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1993 sec (5 req/sec)