Gulf Yards to Split $140m for Repairs

Thursday, January 25, 2007
Six Gulf Coast shipyards damaged by Hurricane Katrina will split 140 (m) million dollars in repair funds from the Navy, reported the AP. Congress appropriated the funds to shipyards that have existing Navy shipbuilding contracts. The August 2005 hurricane caused about one (b) billion dollars in damages to Northrop Grumman shipyards in Gulfport, New Orleans and Pascagoula. The three shipyards currently employ about 17-thousand people, including more than two thousand who commute from southwest Alabama. Others approved for funding include Austal U-S-A and Atlantic Marine, which both operate major shipyards in Mobile. Atlantic, which employs about 650 workers at its two Pinto Island shipyards in Mobile, said its share of the money would be used to repair piers and bulkheads damaged by the hurricane. Austal employs about 800 at its Mobile River shipyard. A spokesman said it sustained minor production delays and wind damage from Katrina. Part of the damage was to a new production shed used to assemble the Littoral Combat Ship for the Navy. The Navy will negotiate with each of the companies to determine how much each will receive. Source: AP
Maritime Reporter September 2013 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Cruise Ship Trends

Keel Laid for Holland America Line’s New Ship

Holland America Line celebrated the keel laying of its new 2,650-guest Pinnacle Class ship on August 22 at Fincantieri’s Marghera shipyard in Italy. A 680-ton block

Kiel Port Growth Continues

Cargo and passenger handling rise by 3%. Handling in the Port of Kiel continued to grow in the first half of the year. A total of 3.24 million tons of cargo

Warming Aids Arctic Economies, but Short of 'Cold Rush'

Climate change is aiding shipping, fisheries and tourism in the Arctic but the economic gains fall short of a "cold rush" for an icy region where temperatures are

Navy

RIMPAC Exercise Puts LCS Through Paces

It was the middle of May, and the littoral combat ship Independence was operating out of San Diego, testing components of the mine warfare mission package. The mission is one that,

DoD Award Dredging, Ship Maintenance, Charter Contracts

US Department of Defense informs of placement of contracts for Chesapeake Bay dredging, dry-docking of USS Pearl Harbor, and charter of surface escort vessels. Details as follows: 1.

General Dynamics Delivers North Dakota (SSN-784) to U.S. Navy

General Dynamics Electric Boat yestereday delivered the nuclear-powered attack submarine North Dakota (SSN-784) on time and more than $30 million below target cost.

 
 
Maritime Contracts Maritime Standards Naval Architecture Offshore Oil Port Authority Salvage Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1018 sec (10 req/sec)