Theodore Roosevelt Moves to Shipyard

Monday, March 12, 2007
Gunner's Mate 2nd Class Lucas Friend and Gunner's Mate 3rd Class Derek Benedict stand watch with a .50-caliber machine gun aboard Nimitz-class aircraft carrier USS Theodore Roosevelt (CVN 71) during transit to Norfolk Naval Shipyard. The nuclear-powered aircraft carrier is currently underway to Norfolk Naval Shipyard for Docked Planned Incremental Availability. U.S. Navy photo by Mass Communication Specialist Seaman William Weinert

USS Theodore Roosevelt (CVN 71) made a four-hour plus transit of the Elizabeth River in Hampton Roads on March 7, on her way to Norfolk Naval Ship Yard for a nine-month Planned Incremental Availability (PIA). The Navy’s fourth Nimitz-class aircraft carrier will undergo more than 90 major modifications, including a JP-5 (fuel system) alteration and installation of a new electronic throttle system in the ship’s propulsion plants. The ship also will receive a rolling airframe missile modification for the Close-In Weapons System, and a local area network (LAN) system upgrade.

Roosevelt's maintenance manager, Lt. Cmdr. Scott Shea, said quality of life improvements, such as 10 new “millennium” restrooms and 12 refurbished restrooms, will help make shipboard life more comfortable for the crew. Some of the modifications began taking place prior to the ship’s arrival at the shipyard. “We planned on refurbishing the heads while we were in the yards, but we’re working ahead of schedule,” Shea said. “We want to accomplish as much as we can as soon as we can, and it looks like we’re off to a good start.” Shea also said more than 600 racks will be replaced and four berthing areas completely renovated. In all, Shea said more than 500,000 man hours will be spent upgrading and repairing the ship during the yard period.

During a general announcement to the crew March 6, Commanding Officer Capt. J. R. Haley said although productivity is important in this evolution, safety takes priority in all situations. He said the ship’s goal is to complete the progression efficiently, yet expeditiously.

By By Mass Communications Specialist 2nd Class Matt Bullock, USS Theodore Roosevelt Public Affairs

Maritime Reporter February 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Tanker Trends

Maersk to Install Transas ECDIS on 100 Vessels

Maersk Line, the world's largest container company, has selected Transas Marine for ECDIS implementation on more than 100 vessels, Transas announced today. The

Rotterdam Gate LNG Terminal Expansion Started

Dutch gas network operator Gasunie and tank storage service provider Vopak said on Monday that the expansion of their Gate liquefied natural gas (LNG) terminal in Rotterdam has begun.

ECDIS to be Installed on 100 plus Maersk Vessels

Maersk Line selected Transas Marine for  ECDIS implementation on  more than 100 vessels.   The contract features Transas state-of-the-art Navi-Sailor ECDIS 4000

Navy

NYC Ferries: Gladding-Hearn Building Three New Vessels

Gladding-Hearn Shipbuilding, Duclos Corporation, has begun construction of the first of three new sightseeing vessels for Circle Line Sightseeing Cruises, Inc., in New York City.

Warships Shell Houthis Outside Yemeni City of Aden

Warships shelled a column of Houthi fighters and troops loyal to former president Ali Abdullah Saleh as they tried to advance on the southern port city of Aden on Monday,

China's Air Drills Roil South China Sea Waters

China's air force conducted its first drill above the western Pacific Ocean on Monday, the Defence Ministry said, in a move that could exacerbate tensions with

 
 
Maritime Careers / Shipboard Positions Maritime Standards Navigation Offshore Oil Pipelines Port Authority Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1305 sec (8 req/sec)