Aker Yards and MSC Signed Cruise Ship Contract

Thursday, March 29, 2007
Aker Yards has signed a contract with MSC Cruises to build a 4th MSC Musica Class Cruise ship. The MSC Magnifica will be built at Aker Yards, Saint-Nazaire and delivered in 2010. The value of the contract is approximately $546.8m (EUR 410 million.) The contract is subject to financing. Like its three predecessors (MSC Musica, MSC Orchestra and MSC Poesia, this 89,600 GT cruise ship is 294 metres long and just over 32 metres wide, and complies with the Panama Canal Standard. MSC Magnifica will carry up to 4,000 people on board (including crew) and have 1275 passenger cabins, 80% of which being outside. Aker Yards is presently completing the construction of MSC Orchestra, which will be delivered in May. The order book also includes the third sister ship, MSC Poesia (delivery: 2008) and two 1650 cabins cruise ships - MSC Fantasia (delivery: 2008) and MSC Serenate (delivery: 2009).
Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Container Ship Delivers First Boxes to Great Lakes Port

The US Coast Guard say that the 'Fortunagracht', a 450-foot Dutch-flagged container ship, has delivered the first-ever load of containerized cargo to the Great Lakes.

Shipping Turns From Banks to Equity Markets for Cash

Shipping companies are turning to equity markets to fill a growing funding gap, betting that investors hungry for decent returns will provide capital to a sector

Keel-Laid for Navy's 10th LCS at Austal Yard

The Navy and Austal USA held a keel-laying ceremony for the future 'USS Gabrielle Giffords', the Navy's 10th littoral combat ship (LCS), in Mobile, Ala., informs

Marine Propulsion

RS at SEA JAPAN 2014

Russian Maritime Register of Shipping (RS) was the only Russian company to take part in SEA JAPAN 2014 exhibition and conference – one of the major exhibitions of the maritime industry.

Havyard to Build Hybrid Battery Arctic PSV

Norway's Havyard says it has signed a contract for the construction of a Havyard 833 WE ICE platform supply vessel with Fafnir Offshore HF. The vessel is to be

GE Gas Turbines Power USS America

GE Marine reports that the United States Navy’s future USS America (LHA 6) amphibious assault ship recently completed successful acceptance sea trials powered by two GE LM2500+ marine gas turbines.

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Offshore Oil Pipelines Port Authority Salvage Ship Simulators Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0772 sec (13 req/sec)