Commuter Ferries for Manila’s Pasig River

Tuesday, May 01, 2007
Long considered a polluted ditch through the city, Manila’s Pasig River is being rehabilitated. Central to this endeavor is a ferry service that will include 15 terminals along a 10.5 mile route stretching from Intramuros near Manila Bay to Pasig City. The bid to operate the system was awarded in 2005 to a joint venture of Filipino groups led by Penta Captial Investment and the Australian Robert Cole of Sydneyside Cruises Ltd. The first of four vessels are now in operation with several more under construction.

Vessel Name: Pasig Ferry Boat Owner: scc NAUTICAL TRANSPORT SERVICES Inc Contact & phone: Robert S. Cole 63915 990 4284 Boat Builder: scc NAUTICAL TRANSPORT SERVICES Inc Boat Designer: Robert S. Cole Vessel: (length X Beam X molded depth) L-23m B-7m D-1.8m draft-1.1m Deck dimension: Passenger area inside 104m2 and outer decks is 22m2 Hull material: FRP Main engines: Cummins QSM-11, 355 horsepower each Marine gear & shafting(model and ratio): ZF 325-1A, 2.037 to 1 Ratio, 2 -inch 316ss shaft Propellers, dimension: 4 blade 30-inch propellers Capacities: 150 Passengers Crew: four Tankage: Fuel: 2 x 1500 litters Water: 2 x 1000 liters Vessel's assignment: Passenger ferries, River and bay operations Design speeds: 19 Knots, operational speed 12 Knots Delivery date: construction of over 10 vessels ongoing with 4 operational at present Noteworthy aspects: at operational speed the vessel fuel consumption per hour is less than 30 litters total for both engines.

Maritime Reporter May 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

EIVA Welcomes New Global Director

The Danish offshore survey solution specialist EIVA a/s has appointed a new global sales director, Jakob Møller Nielsen. He comes from a similar position at SPX Flow Technology,

USCG Assists 2nd Activist From Arctic Challenger

Coast Guard personnel assisted in the removal of an activist who secured herself to the anchor chain of the Arctic Challenger in Bellingham, Wash., Monday morning.

Port Kembla Tariff hiked

NSW Ports have advised that from 1 July, there will be 2.38% increase to the Navigation Service Charge (Port Tonnage) and 3% increase to other charges (site occupancy,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Pipelines Port Authority Salvage Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1735 sec (6 req/sec)