Lake Charles Pilots Orders Boat

Wednesday, June 20, 2007
The Lake Charles Pilots, which operates on the Calcasieu ship channel in southwestern Louisiana, has ordered its third pilot boat from Gladding-Hearn Shipbuilding, Duclos Corporation. Delivery is scheduled for February 2008. According to Lake Charles pilot, Capt. Mike Miller, the new boat order was prompted by plans for more than 400 LNG tankers traveling to terminals on the Calcasieu River by 2008. “With all of this new traffic on the river, we wanted a stable boarding boat with a deep-V hull that can operate continuously to the outermost sea buoy, 30 miles off the coast. The sea conditions out there normally run three to five feet, but can often climb to ten feet,” he said. Featuring the C. Raymond Hunt-designed deep-V hull, the all-aluminum vessel measures 75.8 ft. overall, with a 20.6-ft. beam and a 6.8-ft. draft. With a top speed of 27 knots, the boat will be powered by twin Cummins QSK38M diesel engines, each producing 1350 Bhp at 1900 rpm. The engines will be equipped with Cummins’ Centinel lube-oil management system, adding fresh oil, as needed, to replace oil burned through the fuel system. Two Twin Disc MGX-6620A gear boxes will turn 5-blade Bruntons propellers. The launch will include twin Onan 27kW gensets. The air-conditioned wheelhouse and finished forecastle will include a fully-integrated navigation system, four Lebroc recliners, galley, enclosed head with shower, and three staterooms. Interior sound level in the wheelhouse will be limited to about 75 decibels.
Maritime Reporter February 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Zamakona, Finnish GS-Hydro Ink Deal

The presentation ceremony of the Finnish multinational leader in water services GS-Hydro, new partner of Zamakona Yards in Canarias was held yesterday (January 29th at 7 p.

PHA Budgets $ 275 mi for Capital Improvements

In 2015, the Port of Houston Authority has budgeted $275 million for various capital improvement projects. About $184 million is being allocated to its container

Imabari to Build 20,000TEU Containerships

Imabari Shipbuilding Co., Ltd. announced it has secured newbuild orders with the cooperation of Marubeni Corporation for 11 units of 20,000TEU Ultra-Large Container Carriers,

Shipbuilding

Imabari to Build 20,000TEU Containerships

Imabari Shipbuilding Co., Ltd. announced it has secured newbuild orders with the cooperation of Marubeni Corporation for 11 units of 20,000TEU Ultra-Large Container Carriers,

SSI Launches ShipConstructor 2015 R2.1

SSI has today released ShipConstructor 2015 R2.1 software.   The software release comes in response to emerging ship design, engineering and building trends as

HII Acquires Engineering Solutions Division

Huntington Ingalls Industries (HII) has acquired the Engineering Solutions Division of The Columbia Group, a designer and builder of unmanned underwater vehicles

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Offshore Oil Pipelines Salvage Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1240 sec (8 req/sec)