Two New Modern Seismic Vessels for CGGVeritas in 2010

Monday, July 02, 2007
CGGVeritas and Eidesvik Offshore ASA have entered into an agreement for the supply of two large seismic vessels to be newly built, with a total contract value of approximately $420m. The two vessels will be of an extremely advanced specification, incorporating many unique features, based on the most recent X-BOWdesign of Ulstein Design AS, and will be delivered in 2010 under 12-year time charter agreements.

These two high-capacity vessels are components of CGGVeritas' strategy of progressive fleet renewal, involving the staged retirement of the former generation of lower capacity vessels in conjunction with the introduction of these new platforms. The new vessels are purpose-designed for the efficient deployment of industry-leading Sercel solid streamer technology and configured for spreads of up to 16 long streamers, or 20 shorter streamers in high-density applications. With the introduction of these two new-build vessels, CGGVeritas will operate the most versatile and capable worldwide fleet in the industry. CGGVeritas and Arrow Seismic ASA also announced that they have agreed to cancel the negotiation for a 12 year Bare Boat charter as outlined in the LOI dated December 2006.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter May 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

People & Company News

Fitch Warning on NordLB Shipping Reduction Plan

Norddeutsche Landesbank Girozentrale's (NORD/LB) strategy to reduce its shipping exposures by EUR4bn-6bn over the next three years makes sense, but will likely encounter high execution risks,

Tideland Signal Acquires Julius Signal

Tideland Signal Corporation, now part of Xylem, has entered into a definitive agreement to acquire certain assets of Julius Signal, extending the company’s portfolio

North P&I Club Repots Positive Financial Performance

North P&I Club reports that an exceptionally low year for claims has helped it increase its free reserves by $90 million to $428 million and deliver a combined ratio of 73.

Shipbuilding

Bay Shipbuilding Delivers ATB to Moran

Fincantieri Marine Group’s Fincantieri Bay Shipbuilding (FBS) has delivered the Articulated Tug Barge unit (ATB) Barbara Carol Ann Moran and the 110,000-barrel

Conrad Shipyard Christens Woods Hole Ferry

M/V Woods Hole, a 235-foot long passenger ferry built for the Steamship Authority of Woods Hole, Mass., was christened on May 20 at Conrad Aluminum in Amelia, La.

Tech & Design Solutions for Modern Workboats

EPA Tier 4 regulations (for engines of 804 hp and higher) and propulsion advancements have many manufacturers and vessel designers changing course to adapt to new requirements and customer demands.

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Naval Architecture Pipelines Pod Propulsion Salvage Ship Electronics Shipbuilding / Vessel Construction Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0937 sec (11 req/sec)