Coast Guard Reauthorization Bill Addresses Objectives of USARC

Tuesday, July 31, 2007
U.S. Arctic Research Commission (USARC) issues this statement in support of the Coast Guard Reauthorization Bill recently introduced by Ted Stevens (R-Alaska), Vice Chairman of the Senate Committee on Commerce, Science, and Transportation and Committee Chairman Daniel Inouye (D-Hawaii).

Several items in this bill are responsive to the Commission’s Summary Report on Goals and Objectives for Arctic Research 2007, delivered to the White House and Congress earlier this year. In that report, USARC called for an assessment of Arctic research infrastructure needs, research into oil spills in ice-covered waters, and appropriate investment in new research platforms, including icebreakers, and forward basing to support the nation’s Arctic research programs. The $8.7 billion reauthorization bill would constitute a six percent increase in the Coast Guard’s operating budget, and includes $998 million for renovations to Coast Guard facilities as well as acquisition of new vessels and aircraft. The bill includes $100 million to operate and maintain the nation’s three existing polar icebreakers, including two heavy “polar class” ships, the Polar Sea and the Polar Star, nearing the end of their useful lives. The bill authorizes the Coast Guard to proceed with plans to construct two new vessels.

Long-sought risk assessments for oil spills in the Aleutian Islands/southern Bering Sea region are included in the bill, as well as an increase in endowment funding for the nation’s long-term Arctic/sub-Arctic oil spill research program, conducted by the Prince William Sound Science Center’s Oil Spill Recovery Institute.

Maritime Reporter September 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Search for Ship Lost in Hurricane a Big Challenge

Deep seas may complicate efforts to find the sunken U.S. cargo ship lost off the Bahamas during Hurricane Joaquin, a federal safety investigator said, as a search

MacGregor's Deck Machinery for Sentinel Marine ERRV

MacGregor, part of Cargotec, will supply deck machinery for a new 65m emergency rescue & response vessel (ERRV) for Sentinel Marine. The ship has been designed

Kruszewski Joins Braemar Engineering

Braemar Engineering, the specialist maritime engineering consultancy, today announced the appointment of Chis Kruszewski to the role of Senior Electrical Engineer in its Offshore,

Coast Guard

USCG Search for Missing Crew of El Faro

Coast Guard search and rescue crews continue searching for possible survivors from the cargo ship El Faro Monday night, covering a total search area of more than 160,574 square nautical miles.

USCG: Missing Cargo Ship El Faro Believed to Have Sunk

The U.S. Coast Guard now believes that the missing cargo ship El Faro sank after sailing into the path of Hurricane Joaquin in the Bahamas, a spokesman said on Monday.

Man Medevacs from Boxship Off Santa Rosa Island

The Coast Guard medically evacuated a 46-year-old man from a 738-foot container ship approximately 6 miles south of Santa Rosa Island, Sunday. At 10:01 a.

Maritime Careers / Shipboard Positions Maritime Contracts Naval Architecture Navigation Offshore Oil Pod Propulsion Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0369 sec (27 req/sec)