USCG Suspends Approval Process for New LNG Project

Friday, November 09, 2007
With eyes on more than 400 environmental and safety concerns, the U.S. Coast Guard officially stopped the clock last week on the approval process for the liquefied natural gas (LNG) project planned for the southern stretches of the Santa Barbara Channel. A proposal from Texas-based NorthernStar Energy to convert the Platform Grace oil rig — some 10 miles off the coast of Santa Barbara and directly adjacent to the boundaries of the Channel Islands National Marine Sanctuary — into an LNG facility had been on a fast-tracked review process that could have seen the Clearwater Port project approved as soon as next June — until now, that is. In a letter sent directly to NorthernStar on October 30, the Coast Guard, in conjunction with the U.S. Maritime Administration, put an indefinite halt to the 240-day approval process, pending additional review of the project. The Clearwater Port project comes in the immediate wake of the soundly defeated BHP Billiton Cabrillo Port LNG plan. Shot down by a perfect storm of opposition this past spring and denied by the State Lands Commission, the California Coastal Commission, and Governor Schwarzenegger, the Cabrillo plan — a proposed floating terminal offshore from Oxnard — also had its project clock stopped by the Coast Guard during its approval gauntlet so that similar air quality, water quality, and actual energy demand issues could be addressed. Contracted by Channelkeeper to do the bulk of the legal and scientific heavy lifting in the fight against Clearwater is the Environmental Defense Center (EDC), which also played a key role in the Cabrillo denial. Specifically, concerns reportedly focus on the prospect of Clearwater running massive supertankers — sometimes twice a day — across international shipping lanes, around oil rigs, and through the waters of the marine sanctuary, not to mention fundamentally undermining the purpose of the sanctuary itself. Also of concern is the concept of converting an old oil rig into an LNG facility, a move which would extend the life of the platform by at least 30 years. For its part, NorthernStar representatives reportedly claim their plan, which aims to ship LNG to the rig and then turn it into vapor before sending it ashore via an underwater pipeline to Mandalay Bay in Ventura, is superior to the defunct Cabrillo plan and stands a much better chance of winning approval. [Source: http://www.independent.com]

People & Company News

MN100: MarineCFO

The Company: Founded in 1992, UA Business Solutions was a pioneer in the field of Enterprise Resource Planning (ERP) and an early Microsoft Partner. The ERP evolution

MN100: All American Marine, Inc.

The Company: All American Marine Inc. was founded in 1987 and specializes in the construction of custom tailored aluminum boats from 30 to 150 feet LOA. Today,

Five Minutes with Paul Switzer

Five minutes with Paul Switzer - Manager, Shipbuilding & Offshore, Viega   For readers not familiar with Viega, please give a ‘birds eye’ view, putting the company

LNG

Höegh LNG Speeds up FSRU Conversion

Höegh LNG Holdings Ltd. today announced that it has signed agreements with Wärtsila Oil and Gas (EPCIC regas) and Moss Maritime (engineering) for its first FSRU conversion project,

China Receives First American LNG Cargo

The first cargo of US liquefied natural gas (LNG) to target the world’s largest energy consumer arrived Monday at the Chinese port of Yantian in Shenzhen near Hong Kong.

Pakistan Mulls Second LNG Import Terminal

BW Group (BW) has signed a 15-year agreement with Pakistan GasPort Limited (PGPL) to provide LNG regasification services utilizing a new-build Floating Storage

 
 
Maritime Contracts Navigation Offshore Oil Pod Propulsion Port Authority Salvage Ship Repair Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1067 sec (9 req/sec)