Dockwise Awarded MSC Contract

Wednesday, September 12, 2007
Dockwise Ltd., has been awarded a contract by U.S. Military Sealift Command for the use of one of its specialized open stern vessels for offshore operational design tests. The contract is due to be executed late 2008 and has a gross value in excess of $25m, including the costs of modification of the vessel. This is the fourth time Dockwise will provide one of its large heavy transport vessels to the U.S. Navy for offshore operational tests. These tests are meant to provide data and design criteria for a new navy vessel called MLP (Mobile Logistics Platform). These new MLP vessels are aimed to be part of the navy's sea-basing effort to facilitate the transfer of material from large cargo ships to an intermediate platform for ultimate transfer to shore on various types of landing crafts. Dockwise will provide one of its large flat deck open stern vessels that will be outfitted with a number of technical adjustments required to perform the various tests, amounting to approximately $10m. The testing off the east coast of the U.S. will provide required data that will assist with ramp design and motion compensation in various sea states.
Maritime Reporter September 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Ezra Bags $70m in Offshore Contracts

Ezra Holdings Limited, a leading contractor and provider of integrated offshore solutions to the oil and gas industry, today announced that the Group’s Subsea Services division,

Clean Marine Wins New Contract

Clean Marine has been selected by Hyundai Mipo Dockyard in South Korea to supply exhaust gas cleaning systems (EGCS) for two new MR tankers. IMO’s convention

Liebherr to Deliver RTGs to Mayotte and Manila

Liebherr confirms orders for variable speed RTGs and electric RTGs. DPWorld Asian Terminals Inc. has placed an order with Liebherr Container Cranes for a further 5 RTGs at its Manila facility.

Navy

Navy to Commission Submarine North Dakota

The Navy will commission its newest attack submarine North Dakota, during a ceremony Saturday, Oct. 25, 2014, at Submarine Base New London in Groton, Connecticut.

US Navy CNO: Photo of the Day

Chief of Naval Operations (CNO) Adm. Jonathan Greenert receives a system update brief in the combat information center aboard the Arleigh Burke-class guided-missile

U.S. Navy Contracts 12 Rapid Response Skimmers

Kvichak Marine won a US Navy contract for 12 30-ft.Rapid Response Skimmers (RRS) for delivery over the next 18 months, with options for up to 30 additional skimmers to be delivered through 2019.

 
 
Maritime Careers / Shipboard Positions Maritime Security Maritime Standards Navigation Offshore Oil Pod Propulsion Port Authority Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1168 sec (9 req/sec)