Svitzer Orders Pair of Damen ASD Tugs

Thursday, September 20, 2007
On September 10, Svitzer and Damen Shipyards Gorinchem signed a contract for the construction and delivery two Damen ASD Tugs 2411. Although Svitzer already operates a few Damen Tugs in their fleet of over 500 vessels, this contract represents the first direct order. The deliveries are scheduled for respectively end July and end October 2008. Both tugs will have a bollard pull of approx. 70 metric tons and will be built according to the UK MCA requirements and are well equipped for various port operations.
Maritime Reporter June 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Dredging

LUSCHI Begins Dredging at ArcelorMittal’s Canal

LUSCHI announced today it will mobilize its vessel Giovanella to EspĂ­rito Santo to assist in the dredging and final disposal of accumulated sediments in the seawater storage canal of ArcelorMittal,

Rohr Dredge Continues European Expansion

Rohr International Dredge Holdings, Inc. announced that it acquired Eurl Rohr France, including its current backlog, inventory and all associated intellectual property (IPR), on July 23, 2014.

Dredging at Jurong Port, Singapore

Dredging work will be carried out at Keppel Shipyard Benoi Road, off West Jurong Channel, from 28 July to 30 September. As per the Maritime and Port Authority of Singapore Port Marine Notice No.

 
 
Maritime Security Maritime Standards Naval Architecture Port Authority Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0854 sec (12 req/sec)