Technip to Build New Pipelay Vessel

Tuesday, October 16, 2007
Technip awarded STX Heavy Industries (Korea) a contract for the construction of its new pipelay vessel. This 194m-long vessel will have twin 2,800 ton reels. She will have a top tension capacity of 450 tons for laying rigid steel pipes and flexible products up to 18-in. in diameter through a dedicated lay tower installed at the stern. She will also be equipped with a 150 ton crane, a PLET (pipeline end terminations) handling system and accommodation for 140 people. With a transit speed of 20 knots, she has been specifically designed to minimize intercontinental transits and allow her efficient deployment in all deep water regions of the world. The contract covers detailed design, construction, outfitting and commissioning of all marine aspects, including the installation of all underdeck pipelay equipment. The remainder of the pipelay system will be installed and commissioned at a later date at the pipelay supplier’s facilities. The project will be managed by a dedicated team from Technip's operating center in Aberdeen (Scotland). The new vessel is scheduled for delivery in 2010. “This major investment in a state-of-the-art vessel is part of our fleet development strategy. It will strengthen the Group’s presence on the high-growth Subsea arket and respond to a demand which is evolving towards developments requiring high technological added-value at increasing water depths”, stated Thierry Pilenko, Technip’s Chairman and CEO.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter January 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Crowley Christens 2nd LNG-ready Product Tanker

Crowley christens second of four newly built, LNG-ready product tankers for use in U.S. coastwise trade   Crowley Maritime Corp. has christened the second of

VT Halter Delivers ATB Tug to Bouchard

VT Halter Marine, Inc. announced the delivery of the M/V Morton S. Bouchard Jr., the first of the two 6,000 horsepower Twin Screw Articulated Tug Barge (ATB) tugs to Bouchard Transportation Co.

Damen Builds Cable Installer For Maersk Supply Service

New Damen-built vessel for Maersk Supply Service to undertake long-term charter with DeepOcean   A newbuild DP2 cable installation vessel, Maersk Connector, was

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Standards Offshore Oil Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0690 sec (14 req/sec)