Coast Guard Finds Weaver Cove LNG Terminal Waterway Unsuitable

Thursday, October 25, 2007
The Coast Guard announced its determination that the waterway approach to the proposed Weaver's Cove Liquefied Natural Gas terminal in Fall River, Mass., is unsuitable for LNG tanker traffic due to navigational safety challenges. In his letter of recommendation, the Captain of the Port and Commander of Coast Guard Sector Southeastern New England, Capt. Roy Nash, said that a segment of the transit route extending from Sandy Point to the Weaver's Cove site, presents significant navigational safety challenges to the proposed LNG vessels' size and transit frequency. Chief among the Coast Guard's concerns is the limited maneuvering room between the old and new Brightman Street bridges. The bridges are nearly parallel to each other and are only about 1100 feet apart. The opening in the old bridge is only 98 feet wide and is not aligned with the new bridge opening. The proposed tankers are well over 700 feet in length, over 80 feet wide, with drafts up to 37.5 feet. The proposed transit route would also bring LNG vessels to within 100 feet of the U.S.S. Massachusetts museum, the Braga Bridge, and the State Pier. Nash concluded that such transits cannot be conducted safely on a routine, repeatable basis, and that the risk of a mishap in Mount Hope Bay, and particularly in the Taunton River in the vicinity of the two Brightman Street bridges, is unacceptably high. [Source: HK Law]
Maritime Reporter January 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Navy

New Defense Cooperation with India

Today, on his historic visit to India, President Obama and Prime Minister Modi announced new, ground-breaking agreements on defense cooperation between India

USS Cole Conducts Change of Command

The Arleigh Burke-class guided-missile destroyer USS Cole (DDG 67) conducted a change of command ceremony during a scheduled port visit in Piraeus, Greece, Jan.

Naval Air Forces Holds Change of Command

Commander, Naval Air Forces (CNAF) held a change of command ceremony aboard the aircraft carrier USS John C. Stennis (CVN 74) at Naval Air Station North Island Jan.

Coast Guard

Coast Guard Cutter William Trump Commissioned

The Coast Guard Cutter William Trump was commissioned during a ceremony at Coast Guard Sector Key West Saturday Jan. 24, 2015. The Trump is the 11th fast response cutter in the Coast Guard fleet.

CBP P-3 Crews Disrupt Drug Smuggling

U.S. Customs and Border Protection Office of Air and Marine agents and interagency partners disrupted two separate drug smuggling attempts off the coast of

Oil Platform Ablaze in the Gulf of Mexico

Fire broke out on an unmanned oil platform in the Gulf of Mexico approximately five miles south of Port Fourchon, La., the Bureau of Safety and Environmental Enforcement (BSEE) reported.

 
 
Maritime Security Maritime Standards Naval Architecture Navigation Offshore Oil Pipelines Salvage Ship Electronics Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1617 sec (6 req/sec)