Navy Cancels Fourth LCS

Friday, November 02, 2007
Secretary of the Navy Donald C. Winter and Chief of Naval Operations Adm. Gary Roughead said Nov. 1 that the Department of the Navy is terminating construction of the fourth littoral combat ship (LCS 4) for convenience under the termination clause of the contract because the Navy and General Dynamics could not reach agreement on the terms of a modified contract.

The Navy had not yet authorized construction on LCS 4, following a series of cost overruns on LCS 2. The Navy intended to begin construction of LCS 4 if the Navy and General Dynamics could agree on the terms for a fixed-price incentive agreement. The Navy worked closely with General Dynamics to try to restructure the agreement for LCS 4 to more equitably balance cost and risk, but could not come to terms and conditions that were acceptable to both parties.

The Navy remains committed to the LCS program.

"LCS continues to be a critical warfighting requirement for our Navy to maintain dominance in the littorals and strategic choke points around the world," said Winter. "While this is a difficult decision, we recognize that active oversight and strict cost controls in the early years are necessary to ensuring we can deliver these ships to the fleet over the long term."

"I am absolutely committed to the Littoral Combat Ship," said Roughead. "We need this ship. It is very important that our acquisition efforts produce the right littoral combat ship capability to the fleet at the right cost."

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

Gazprom, Vietnam Boost Cooperation in Energy Sector

The Gazprom headquarters hosted a working meeting between Alexey Miller, Chairman of the Company's Management Committee and Fam Suan Shon, Ambassador Extraordinary

Rosneft and NADL Sign Exchange of Assets Deal

Rosneft, Seadrill Limited and North Atlantic Drilling Limited (NADL) signed a Framework Agreement that envisages long-term cooperation in the sphere of oilfield development projects.

EBDG Completes Repower of COLUMBIA

Elliott Bay Design Group (EBDG), a leading naval architecture and marine engineering firm with offices in Seattle, New Orleans and Ketchikan, Alaska today announced

Navy

Mexican Navy Delegation Visits NSSA

The U.S. Navy reported that its Norfolk Ship Support Activity (NSSA) welcomed the Mexican Navy Delegation to Building CEP-200, Naval Station Norfolk, Aug. 21 for

Airbus May Sell Stake in Submarine Supplier

Airbus is considering a sale of its 49 percent stake in submarine supplier Atlas Elektronik as part of a reshuffle of its military business, German newspaper Die

Today in U.S. Naval History: August 22

Today in U.S. Naval History - August 22 1912 - Birthday of Dental Corps 1945 - First surrender of Japanese garrison at end of World War II; USS Levy receives

 
 
Naval Architecture Navigation Offshore Oil Pod Propulsion Salvage Ship Electronics Ship Simulators Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0972 sec (10 req/sec)