Goal-based Standards Top IMO's Agenda

Tuesday, May 10, 2005
The development of goal-based standards for new ship construction will be high on the agenda when IMO's Maritime Safety Committee (MSC) meets at the Organization's London Headquarters for its 80th session from 11 to 20 May 2005.

Other important issues on the MSC agenda include the adoption of revised provisions for subdivision and stability in SOLAS chapter II-1 Construction - Structure, subdivision and stability, machinery and electrical installations, continued work on passenger ship safety and implementation of the maritime security measures adopted by IMO.

Goal-based new ship construction standards

The MSC is expected to re-establish the Working Group on Goal-based New Ship Construction Standards to further progress the work on the issue, based on the premise agreed at the last session that the standards should be broad, over-arching goals against which ship safety should be verified at the design and construction stages and during ship operation. The MSC has already reached general agreement on the proposed five-tier system, consisting of goals (Tier I), functional requirements (Tier II), verification of compliance criteria (Tier III), technical procedures and guidelines, classification rules and industry standards (Tier IV) and codes of practice and safety and quality systems for shipbuilding, ship operation, maintenance, training, manning, etc. (Tier V).

The Working Group is expected to finalize the basic principles of goal-based standards, the Tier I goals and the Tier II functional requirements for consideration and approval by the Committee. In particular, extensive discussions are expected on the functional requirements preliminarily agreed at the last session, concentrating on issues such as design life, environmental conditions, fatigue life, coating life, corrosion addition, structural strength, construction quality, maintenance, transparency, operating conditions, information keeping, actual service life and watertight and weathertight integrity.

Substantial progress is expected with regard to the verification of compliance criteria (Tier III), in particular concerning the question of who should verify the compliance of the classification societies' rules with the goal-based standards and the mechanism and procedure of verification. Other issues will include the consideration of the provisions of the goal-based new ship construction standards could be incorporated in the appropriate IMO instruments, including the preparation of relevant options for the Committee to consider.

Further discussions are expected with regard to other issues raised in the submissions to the session, concentrating, inter-alia, on the linkage between goal-based standards and formal safety assessment, the role of the human element and the relationship between a performance-based and a risk-based approach.

Maritime Reporter October 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Steven Palazzo Visits HII, Newport

Huntington Ingalls Industries today hosted Rep. Steven Palazzo, R-Miss., for a tour of the company's Newport News Shipbuilding division. Palazzo represents the fourth district of Mississippi,

Everett College to Launch New Research Boat

Everett Community College’s Ocean Research College Academy (ORCA) will launch its new research vesel on November 22 with a celebration at 11 a.m. at the Port of Everett.

Video: Reefer RoRo Ship Design Rebooted

Expanding on the Reefer RoRo Ship design release in September last year, naval architects group Knud E. Hansen A/S has continued the development of the new Reefer RoRo Ship design with version II.

News

7 Rescued from Sinking Freighter Near Haiti

Seven crewmembers were rescued after their 100-foot coastal freighter began taking on water and sank approximately 45 miles north off of Cap Haitien, Haiti, Friday.

Gazprom Transgaz Ufa Organizes Arts Festival

Over 200 healthy children and children with disabilities from Bashkortostan as well as the Volga Region participated in the Breaking the Barriers second interregional children’s arts festival,

Time-out for Kwanza Drilling

Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola.

 
 
Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Pipelines Salvage Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1856 sec (5 req/sec)