M/V Taku has Mechanical Problem

Friday, May 13, 2005

The Alaska Marine Highway System announced that the MV Taku has not been able to leave Ketchikan, due to mechanical problems. The Taku was expected to sail from Ketchikan Monday night to fill in for the MV Columbia, also stuck in Ketchikan with a mechanical problem. Passengers who anticipated taking the Taku north or south from Juneau will not be able to do so at this time.

“We had expected to be able to bring the Taku on-line in fairly short order, but we are experiencing a steering and control problem with her that has held up bringing her back into service,” said Captain John Falvey, AMHS general manager. “In the meantime, however, we are making good progress on the Columbia’s starboard engine and hope to conduct sea trials with that vessel on Friday. Our goal is to sail north with the Columbia on Friday, get it caught up on moving the many delayed passengers on to their destinations, and turn it around in time for its regularly scheduled southbound run from Skagway on Monday.”

Falvey acknowledged that the mechanical problems of the two ferries have been a big inconvenience for many passengers, both northbound and southbound.

“We would like to extend our apologies to every one of our customers who has been affected by these delays,” he said. “The ferry propulsion, steering and control systems are fairly complicated, and while we did not anticipate having the combination of issues with these vessels we are now in the midst of, we are working 24-7 to resolve those problems. We want the traveling public to be confident that the Alaska Marine Highway vessels they will be riding on are safe, reliable, and ready for the work we require of them. We appreciate the patience shown by everyone affected.”

Maritime Reporter July 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Ship Repair & Conversion

China’s Shipyards Face Tough Times

As the shipping market continues its prolonged downturn five shipyards have filed for bankruptcy this year, reports SCMP.   China's leading private shipyards

Ferguson to Build Two CalMac Ferries

Scottish minister Nicola Sturgeon have named Ferguson shipyard as the preferred bidder for a £97 million contract for the biggest new ferries on the Clyde since

Private Ship Repair Moves Dry Dock Timelines

A delay in private repairs to the hospital ship Africa Mercy has caused a two-and-a-half week adjustment of timelines for Transnet National Ports Authority’s R30

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Navigation Offshore Oil Pod Propulsion Ship Repair Shipbuilding / Vessel Construction Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.3408 sec (3 req/sec)