NASSCO Lays Keel for BP Tanker

Wednesday, April 20, 2005
National Steel and Shipbuilding Company (NASSCO) held a keel-laying ceremony for Hull 487, the fourth ship of the Alaska Class double-hull oil tankers being constructed for BP Oil Shipping Company, USA. BP’s Site Team Member John Penso welded his initials into the keel to signify the start of structural erection.

"These double-hull tankers are providing BP with the best available propulsion, ship, and environmental control technologies to protect US waters," said Richard Vortmann, president of NASSCO. Vortmann added that the design of the 1.3-million-barrel-capacity tankers in the Alaska Class will allow maximum flexibility for oil deliveries to West Coast ports, including BP refineries in Los Angeles, CA, and Cherry Point, WA.

"The BP tanker contracts have created hundreds of jobs for NASSCO and are contributing millions of dollars in payroll, tax revenues and purchases from local suppliers each year during the life of the contract, which will run through 2006," added Vortmann. "We are continuing to hire people to fill hundreds of positions that remain available for this and other shipbuilding programs in our 10-ship backlog."

The first ship in the class, the Alaskan Frontier, was delivered in August 2004 and the second ship, the Alaskan Explorer, was delivered in March 2005. On April 10, the third ship was floated out of NASSCO’s graving dock following structural erection and is being completed pierside at the NASSCO shipyard. The third ship will be delivered later this year and the fourth ship in 2006.

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Offshore

EOC Takes Full Ownership of OSVs

On 26 August 2014, EOC Limited agreed to acquire 50% of the entire issued share capital of Lewek Antares Shipping Pte. Ltd. (the "Target") , a company incorporated under the laws of Singapore,

OSV Power

The continued maturation of Offshore Service Vessel design is embodied in recent contracts and deliveries.  Ulstein Verft subsea newbuild Island Performer was

Lamprell First Half Results Beat Expectations

Lamprell today announced its financial results for the first half of 2014, reporting results ahead of expectations due to strong operational performance and early results from savings initiatives,

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Naval Architecture Navigation Pipelines Port Authority Ship Electronics Ship Repair Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1300 sec (8 req/sec)