Sonsub Contracts New 280ft Vessel

Thursday, February 03, 2005

Sonsub Inc. recently signed a 3 year charter agreement with Otto Candies, LLC for a New Build IMR Construction Vessel. The yet to be named 280ft, Class II DP Vessel includes a 100T tele-knuckle boom crane, a 20’ X 25’ moon pool, accommodations for 66 personnel, and outfitted with one or two 200Hp Innovator ROV systems depending upon the project and client requirements.

The vessel will be the first and only US flagged vessel in the GOM capable of supporting subsea construction projects in addition to standard remote intervention and maintenance tasks. The Moon-pool & crane arrangement will allow safe and stable deployment to the seabed on heavy loads, like manifolds, as well as the lay of umbilical and/or coil tubing lines.

Sonsub anticipates vessel availability starting March 2006 in the Gulf of Mexico.

Maritime Reporter July 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

SBI Offshore Negotiating Contract for Rig Builds

SBI Offshore Limited has announced that the Middle East-Chinese consortium, which recently awarded its subsidiary a contract to provide design and engineering services for a jack-up drilling rig,

Brazilian PSVs Get Rolls-Royce Offshore Cranes

Rolls-Royce signed a contract with Detroit Chile SA to supply offshore cranes to nine Platform Supply Vessels (PSVs) presently under construction at Detroit Brasil Ltda.

ABS to Class First Self-elevating Unit Built in Qatar

ABS, a provider of classification services to the global offshore industry, was selected by Nakilat-Keppel Offshore & Marine (N-KOM) to class its LB310S liftboat,

Vessels

Report: Ports Lack Maintenance Support

The latest Barometer Report from Trelleborg has revealed a huge gap in the maintenance requirements of port owners and operators, and the support that suppliers are able to provide.

Brazilian PSVs Get Rolls-Royce Offshore Cranes

Rolls-Royce signed a contract with Detroit Chile SA to supply offshore cranes to nine Platform Supply Vessels (PSVs) presently under construction at Detroit Brasil Ltda.

US Aircraft Carrier 'Ike' Leaves Drydock

The aircraft carrier USS Dwight D. Eisenhower (CVN 69) (Ike) has left dry dock and moved from Dry Dock 8 to pier 42/43 at Norfolk Naval Shipyard (NNSY) in Portsmouth, Va.

 
 
Maritime Contracts Maritime Security Naval Architecture Navigation Offshore Oil Salvage Ship Electronics Ship Repair Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1345 sec (7 req/sec)