Navy to Christen Experimental (X-Craft) Sea Fighter

Thursday, February 03, 2005
(Pictured is the Littoral Surface Craft – Experimental, "X-Craft," will be christened SEA FIGHTER (FSF-1) on 5 February 2005. The ceremony will take place at the Nichols Brothers Boatyard on Whidbey Island, Washington.)

The Navy will christen the experimental X-Craft "Sea Fighter" and designate it as the first Fast Sea Frame, Saturday, Feb. 5, during a noon PST ceremony at Nichols Bros. Boat Builders, Whidbey Island, Wash. Rep. Duncan Hunter, chairman of the House Armed Services Committee, will deliver the principal address. His wife, Lynne Hunter, is the ship's sponsor. In the time-honored Navy tradition, she will break a bottle of champagne across the bow to formally christen the ship "Sea Fighter."

The high-speed, experimental vessel will test a variety of technologies that will allow the Navy to operate more effectively in littoral, or near-shore, waters. Sea Fighter will be used to evaluate the hydrodynamic performance, structural behavior, mission flexibility, and propulsion system efficiency of high-speed vessels, and will also serve as a test bed for developmental mission packages. It will serve as a "risk reduction," experimental vessel for the Littoral Combat Ship and Coast Guard's Deepwater Program concept of operation development at sea.

The keel of the aluminum catamaran was laid in June 2003, is 262 feet in length and displaces 950 tons. The ship has a beam of 72 feet and a navigational draft of 11.5 feet. Two gas turbine engines, two propulsion diesels and two waterjets will power Sea Fighter to speeds reaching 50 knots.

The Sea Fighter's crew will consist of 16 Navy sailors and 10 Coast Guardsmen.

Maritime Today

The Maritime Industry's original and most viewed E-News Service

Maritime Reporter November 2015 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds


Maersk to Idle Vessel

The world's biggest container-ship operator Maersk Line  has confirmed market talk that it has temporarily idled one of its largest vessels - yet another sign that the industry is in dire straits,

Russian Navy Trying Hard for Facelift

Official announcements related to naval shipbuilding give the appearance of a Russian Navy that is undergoing a rapid revival. However, the reality is that many

USNS Maury Completes Acceptance Trials

USNS Maury (T-AGS 66) completed Acceptance Trials, November 6, following a week of extensive ship tests and underway events, included testing of major propulsion,

Maritime Contracts Maritime Security Maritime Standards Navigation Pod Propulsion Salvage Ship Electronics Ship Repair Ship Simulators Sonar
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0637 sec (16 req/sec)