VOSTA Package for New Manson Dredge

Tuesday, January 25, 2005
Seattle-based Manson Construction Co ordered a dredge component package with VOSTA Inc. for the 9200 m2 Trailing Suction Hopper Dredge they are building at Alabama Shipyards. At present the dredge is under construction and will be delivered according to planning in October 2005.

Via VOSTA LMG USA distributor Hagler Systems, VOSTA Inc will deliver 3 x 38 inch universal dragheads for optimal dredging results, the jet system into the hopper for mixture fluidization and a VOSTA LMG MK3-28 inch type universal Bow coupling installation for discharging purposes.

The VOSTA LMG components will be delivered in the spring of 2005. Assembly onto the dredge will take place under VOSTA Inc.'s specialist guidance.

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Contracts

Container Ship Delivers First Boxes to Great Lakes Port

The US Coast Guard say that the 'Fortunagracht', a 450-foot Dutch-flagged container ship, has delivered the first-ever load of containerized cargo to the Great Lakes.

Shipping Turns From Banks to Equity Markets for Cash

Shipping companies are turning to equity markets to fill a growing funding gap, betting that investors hungry for decent returns will provide capital to a sector

Keel-Laid for Navy's 10th LCS at Austal Yard

The Navy and Austal USA held a keel-laying ceremony for the future 'USS Gabrielle Giffords', the Navy's 10th littoral combat ship (LCS), in Mobile, Ala., informs

Dredging

Van Oord acquires 100% control of Dravo

Van Oord has acquired all shares of its Spanish subsidiary Dravo S.A.  Dravo S.A. has been owned, since 1987, by Van Oord (50%) and the Spanish company Dragados S.

US FMC Commissioner Visits Panama Canal Expansion Sites

Counsel to the U.S. Federal Maritime Commission informs that  Commissioner William P. Doyle has recently surveyed the construction site on a visit to the Pacific-side of the expanded Panama Canal.

Construction of Changi East Finger Extension

The working period for the construction of Changi East Finger Extension has been extended, GAC said in its daily Hot Port News report. The works will now be conducted from April 25 to October 24,

 
 
Naval Architecture Offshore Oil Pod Propulsion Port Authority Salvage Ship Electronics Ship Repair Ship Simulators Shipbuilding / Vessel Construction Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1030 sec (10 req/sec)