Alaskan Ferry Sustains Damage

Tuesday, December 21, 2004
The Alaska Marine Highway System (AMHS) is cooperating with U.S. Coast Guard Marine Safety Office Juneau to investigate and evaluate structural damage sustained to the ferry Fairweather Thursday (December 16) in Southeast Alaska waters.

Fairweather sustained damage by waves during a regularly scheduled voyage from Haines to Juneau late Thursday afternoon.

The vessel carried 101 passengers at the time, including the commanding officer of Marine Safety Office Juneau. At no time during the voyage were the passengers in any danger. Crewmembers discovered the damage after the Fairweather safely docked in Juneau upon completion of the voyage. Damage appears confined to a void space located at the forward part of the vessel between the two catamaran hulls. Several of the internal structural frames also suffered damage along with an 18-inch tear in the vessel's hull plating. All damage is about 14 feet above the waterline.

Coast Guard marine inspectors examined the damage and are prohibiting the ship from carrying passengers or vehicles until satisfactory repairs are completed.

A Coast Guard investigation is underway to determine the cause of the casualty. The vessel's master reduced speed during the voyage and crewmembers took steps to ensure the safety of the passengers.

The Coast Guard will remain engaged throughout the repair process and will review and approve all repair proposals. One of Coast Guard Marine Safety Office Juneau's many missions is to inspect commercial vessel's plying U.S. waters to ensure they are safely maintained to prevent vessel casualties.

Maritime Reporter March 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Shipbuilding

Azeri Shipyard, BP Sign Vessel Construction Contract

Azeri state energy company SOCAR's shipyard and British oil major BP have signed a $378 million deal to design and build a subsea construction vessel for the Shah Deniz II gas project,

Fishing Vessels Fit with Wärtsilä’s NOx Reducer

Wärtsilä said its new NOx Reducer will be fitted to two new fishing vessels under construction at the Celiktrans yard in Turkey. The ships are owned by HB Grandi,

CMM Takes Delivery of Damen PSV for Brazil

New supplier CMM Gravity to start on long-term contract with Petrobras. CMM has taken delivery of a Damen Platform Supply Vessel 3300. The 80-meter, 3,300t deadweight

 
 
Maritime Careers / Shipboard Positions Maritime Standards Naval Architecture Navigation Pipelines Pod Propulsion Port Authority Ship Electronics Ship Repair Ship Simulators
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1145 sec (9 req/sec)