Suez Deepening Proceeds

Monday, January 29, 2001
Work on deepening the Suez Canal to 62 feet (18.9 m) from 60 feet will be completed soon, a Suez Canal Authority official said. "Work on deepening the canal has come to an end, except for a 1.5-km (one-mile) stretch of hard rock which will take at least another one and a half months to complete," Abdel-Fatah al-Miqati, a board member at the Authority, said. Miqati was referring to a project that began in 1997. He said work had begun the next phase to deepen the canal to 66 feet, due to be completed by 2005. He said these operations were part of an overall plan to widen the canal to 400 m and deepen it to 72 feet by 2010. The canal will now be able to accommodate ships up to 200,000 tons. Fees from the Suez Canal constitute one of Egypt's main sources of foreign currency.
Maritime Reporter August 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Legal

Australia, New Zealand Navies Intercepts Drugs off Africa

A combined Australian and New Zealand operation 260 km off the coast of Africa has seized more than 5.6 metric tons of cannabis resin worth an estimated $280 million (AUD).

Nigerian Oil Workers Call Off Strike After Talks with Government

Nigerian oil workers' unions have called off a four-day strike after reaching a deal with the government in a dispute over pensions, they said on Saturday. A

Nigerian Minister Pledges $1.3 bln for Power Companies

Nigeria's oil minister announced a 213 billion naira (1.3 billion US dollar) bail-out package for power companies on Saturday, nearly a year after the sector was privatised.

Navigation

NOAA Orders Newbuild Navigation Response Boats

NOAA today announced that Lake Assault Boats of Superior, Wisconsin, will build two small vessels for the Office of Coast Survey's navigation response program,

Seagull Maritime Response on Safety, Security

Key areas of concern for seafarer safety and security in both marine and offshore operations have triggered the release of six new and one supplementary titles

FPSO Petrojarl Knarr Delivered to Norway

Three tugs of Fairmount Marine have towed the brand new FPSO Petrojarl Knarr from South Korea to Norway in just 61 days. Petrojarl Knarr, one of world’s largest

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Offshore Oil Pipelines Port Authority Salvage Ship Electronics Ship Repair Ship Simulators
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1031 sec (10 req/sec)