Suez Deepening Proceeds

Monday, January 29, 2001
Work on deepening the Suez Canal to 62 feet (18.9 m) from 60 feet will be completed soon, a Suez Canal Authority official said. "Work on deepening the canal has come to an end, except for a 1.5-km (one-mile) stretch of hard rock which will take at least another one and a half months to complete," Abdel-Fatah al-Miqati, a board member at the Authority, said. Miqati was referring to a project that began in 1997. He said work had begun the next phase to deepen the canal to 66 feet, due to be completed by 2005. He said these operations were part of an overall plan to widen the canal to 400 m and deepen it to 72 feet by 2010. The canal will now be able to accommodate ships up to 200,000 tons. Fees from the Suez Canal constitute one of Egypt's main sources of foreign currency.

Maritime Today


The Maritime Industry's original and most viewed E-News Service

Maritime Reporter July 2016 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Legal

Guzmán Re-elected Harbor Commission President, Long Beach Port

Harbor Commission President Lori Ann Guzmán was re-elected Monday evening to serve a second one-year term leading the board that oversees the Port of Long Beach, the nation’s second-busiest seaport.

Bahri Q2 Net Profit Soars

National Shipping Company of Saudi Arabia (Bahri), the exclusive oil-shipper for Saudi Aramco, reported a 47.2 percent increase in second-quarter net profit on Tuesday.

U.S. Backs S. China Sea Bilateral Talks

U.S. Secretary of State Kerry says backs bilateral talks; Philippines says dispute does not involve United States. U.S. Secretary of State John Kerry said on

Navigation

CNCo Orders Remote Monitoring for 35 Vessels

Radio Holland, a global NavCom and service company in the maritime industry, said it has concluded  a maintenance and remote monitoring agreement with The China

Keel Laying for Russia's Second Nuclear Icebreaker

Today the Baltic Shipyard in St Petersburg (part of United Shipbuilding Corporation) laid the keel of Ural, Project 22220’s second series-produced nuclear icebreaker.

Sunken Barge Impedes Waterway Traffic Near Galveston

A barge sank east of the Galveston Causeway railroad bridge Tuesday, causing the U.S. Coast Guard to issue a safety zone and temporarily restrict traffic on the Gulf Intracoastal Waterway.

 
 
Maritime Careers / Shipboard Positions Maritime Contracts Maritime Security Maritime Standards Naval Architecture Navigation Salvage Ship Repair Sonar Winch
rss | archive | history | articles | privacy | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.0687 sec (15 req/sec)