Suez Deepening Proceeds

Monday, January 29, 2001
Work on deepening the Suez Canal to 62 feet (18.9 m) from 60 feet will be completed soon, a Suez Canal Authority official said. "Work on deepening the canal has come to an end, except for a 1.5-km (one-mile) stretch of hard rock which will take at least another one and a half months to complete," Abdel-Fatah al-Miqati, a board member at the Authority, said. Miqati was referring to a project that began in 1997. He said work had begun the next phase to deepen the canal to 66 feet, due to be completed by 2005. He said these operations were part of an overall plan to widen the canal to 400 m and deepen it to 72 feet by 2010. The canal will now be able to accommodate ships up to 200,000 tons. Fees from the Suez Canal constitute one of Egypt's main sources of foreign currency.
Maritime Reporter November 2014 Digital Edition
FREE Maritime Reporter Subscription
Latest Maritime News    rss feeds

Legal

US Shippers, West Coast Dockworkers Union Resume Contract Talks

Negotiators for shipping lines and terminal operators at 29 U.S. West Coast ports resumed contract talks with the union for dockworkers on Thursday, as cargo backups continued at the ports,

Report: Dire Conditions in Indian Shipbreaking Yards

Report by Indian research institute reveals poor enforcement of occupational health and safety provisions   The working and living conditions at the shipbreaking yards of Alang,

Italian Shipbuilder Pleads Guilty to Environmental Crimes

An Italian shipping firm based in Genoa, Italy, pleaded guilty to violating the Act to Prevent Pollution from Ships by falsifying required ships’ documents to hide

Navigation

Transas Installs ECDIS Simulators at Romanian University

Romanian university Constanța Maritime University will provide ECDIS training in accordance with the STCW 2010 requirements    Transas Marine has installed the

Port of Amsterdam to Reward Green Barges

The cleaner the vessels, the larger the discount on Inland Harbour Dues. Port of Amsterdam will be joining the Green Award program for inland barges on January 1,

Panama Canal Expansion Moves Ahead

The works for the grout curtain to protect the foundation of Borinquen 1E Dam concluded today. The grout curtain is 2.4 kilometers long and 15 meters deep under

 
 
Maritime Careers / Shipboard Positions Maritime Security Offshore Oil Pipelines Pod Propulsion Salvage Ship Electronics Ship Simulators Sonar Winch
rss | archive | history | articles | privacy | terms and conditions | contributors | top maritime news | about us | copyright | maritime magazines
maritime security news | shipbuilding news | maritime industry | shipping news | maritime reporting | workboats news | ship design | maritime business

Time taken: 0.1119 sec (9 req/sec)